Operation
4
Checks and tasks before daily use
6210_003-067_V2
2
1
Checking the vertical lift mast
position (variant) for correct function
NOTE
The function check of the lift mast vertical
position (variant) must be carried out every
time a truck is commissioned.
– Press the Softkey
(1).
The comfort feature "lift mast vertical posi-
tion" is switched on. The symbol
(2) is
displayed.
– Tilt the lift mast backwards.
The lift mast must tilt back fully and move
gently as far as the end stop.
– Tilt the lift mast forward.
The lift mast must tilt forwards and stop in the
vertical position.
– Release the operating device to tilt and
actuate again.
The lift mast must tilt forwards fully and move
gently as far as the end stop.
Zero adjustment of the load mea-
surement (variant)
NOTE
A zero adjustment must be carried out in
order to guarantee the accuracy of the load
measurement (variant) at all times. Zero
adjustment is required
•
Before daily use
•
after changing the fork arms
•
after fitting or changing attachments.
NOTE
Accurate zero adjustment is only possible if
the fork is not carrying a load. Do not take up a
load yet.
171533 EN - 02/2019 - 19
95
Содержание RX60-35/600
Страница 2: ......
Страница 4: ......
Страница 14: ......
Страница 15: ...1 Foreword ...
Страница 38: ...1 Foreword Environmental considerations 24 171533 EN 02 2019 19 ...
Страница 39: ...2 Safety ...
Страница 71: ...3 Overviews ...
Страница 73: ...Overviews 3 General view 171533 EN 02 2019 19 59 ...
Страница 86: ...3 Overviews Operating devices and display elements 72 171533 EN 02 2019 19 ...
Страница 87: ...4 Operation ...
Страница 384: ...4 Operation Decommissioning 370 171533 EN 02 2019 19 ...
Страница 385: ...5 Maintenance ...
Страница 392: ...5 Maintenance General maintenance information 378 171533 EN 02 2019 19 ...
Страница 396: ...5 Maintenance General maintenance information 382 171533 EN 02 2019 19 ...
Страница 432: ...5 Maintenance 1000 hour maintenance yearly maintenance 418 171533 EN 02 2019 19 ...
Страница 433: ...6 Technical data ...
Страница 458: ...6 Technical data Fuse assignment 444 171533 EN 02 2019 19 ...
Страница 469: ......
Страница 470: ...STILL GmbH 171533 EN 02 2019 19 ...