Load lift system
Mast: grease the support points
Mast: grease
Mast: check the mounting
Lifting chains: clean, adjust and grease
Check the condition and mounting of the guard grille
Check the condition and the length of the mast chain
Lift cylinders, chains, rollers and stroke-end stops: check the condition, mounting and operation
Fork carriage: check
5000-hour maintenance plan
Depending on the application, environmental conditions and driving style, the following proce-
dures should be carried out every 5000 and 10,000 hours
Information
Carry out all 1000-hour maintenance work
Hydraulics
Drain the hydraulic oil
10,000-hour service plan
Depending on the application, environmental conditions and driving style, the following proce-
dures should be carried out every 10,000 hours
Information
Carry out all 1000-hour maintenance work
Carry out all 5000-hour maintenance work
Motor
Drain the transmission gear oil
Maintenance
5
5000-hour maintenance plan
99
11718011551 EN - 02/2021 - 05
Содержание EXV-CB 06
Страница 2: ......
Страница 4: ......
Страница 10: ......
Страница 11: ...1 Introduction ...
Страница 20: ...Introduction 1 Disposing of components and batteries 10 11718011551 EN 02 2021 05 ...
Страница 21: ...2 Safety ...
Страница 31: ...3 Overviews ...
Страница 40: ...Overviews 3 Markings 30 11718011551 EN 02 2021 05 ...
Страница 41: ...4 Use ...
Страница 101: ...5 Maintenance ...
Страница 126: ...Maintenance 5 Storage and decommissioning 116 11718011551 EN 02 2021 05 ...
Страница 127: ...6 Datasheet ...
Страница 136: ...h4 Height HT Mast extended mm 4077 4827 h2 Free lift mm 1129 1379 Datasheet 6 Mast types 126 11718011551 EN 02 2021 05 ...
Страница 140: ......
Страница 141: ......
Страница 142: ...STILL GmbH 11718011551 EN 02 2021 05 ...