INSTALLATION
Installation
WS, WS-G
| 21
ENGL
IS
H
d
00000
75
19
0
f
f
Guide the appliance onto the hooks in the casing. use the
rectangular recesses.
f
f
Tighten the screw connection between the appliance
and the mounting rail or heating circuit distributor (for
torque, see chapter "Specification / dimensions and
connections").
f
f
Connect the mounting rail or heating circuit distributor to
the pipework with flat gaskets.
Removing the casing door and frame
f
f
Open the latch of the casing door.
f
f
Tilt the casing door forwards. Lift the rebate of the casing
door from the frame.
f
f
undo the four screws inside the corners of the casing for
unfinished walls.
f
f
Remove the frame.
10.2 Water connection
!
Material losses
dirt and sludge can accumulate in the appliance and
cause overheating, noise, corrosion and faults in the
appliance.
f
f
Thoroughly flush the heating system before con-
nection.
f
f
Route the pipework up to the appliance.
f
f
Connect the pipework to the shut-off valve of the appli-
ance ensuring that it is stress-free.
f
f
Check the correct position of the shut-off valves.
10.3 Electrical connection
WARNING Electrocution
Before any work on the appliance, disconnect all
poles from the power supply.
f
f
Route the electrical connections into the appliance.
10.4 Completing the installation
10.4.1 Finished walls
f
f
Fit the casing door in reverse order to its removal.
10.4.2 Unfinished walls
!
Material losses
Incorrect installation can lead to flames and smoke
spreading through the supply duct in case of a fire.
f
f
Observe the fire regulations.
f
f
Insulate the wall recess correctly.
f
f
Close off/plaster the wall recess.
d
00000
75
19
1
f
f
Place the frame on the casing for unfinished walls so that
the 4 fixing tabs are located on the screws. Tighten the
screws.
f
f
Fit the casing door in reverse order to its removal. ensure
you insert the rebate of the casing door into the frame.