32
Assembly lateral sheet
Lateral sheets
In the next step the lateral sheets will be mounted.
They are distinguished for the assembly on the right or the left
side as well as for the lateral eaves sheet on the top or below.
In case of vertical collectors use two lateral sheets per row (left
and right).
In case of horizontal collectors use
one lateral sheets per row
(left and right).
Start the assembly with the lower lateral sheet. Push it first
on the lower end under the sealing profile into the groove of
the collector profile and simultaneously into the corresponding
eaves sheet edge.
Содержание FKF 200
Страница 1: ...Assembly instructions Solar collectors FKF 200 240 270 Roof integrated installation...
Страница 43: ...43 Initial operation Schematic drawing of the system construction and piping scheme...
Страница 44: ...44 Initial operation Schematic drawing of the system construction and piping scheme...
Страница 45: ...45 Notes Initial operation...
Страница 46: ...46 Notes Initial operation...