27
Assembly eaves sheet
Preparation
Before starting the assembly of the plate set the collector field must completely be installed hydraulically, rinsed,
bled and tested for leak tightness. Stop possible defects before starting assembly of the plate set.
Subsequent installation or checking is not possible when the sheets are mounted.
Start the assembly of the plate set starts definitively with the
left eaves sheet.
The following eaves sheets must be pushed on the left into the
respective previously mounted eaves sheet.
Push the eaves sheet on the left side under the sealing lip and
click it into the groove of the collector profile.
After pushing the eaves sheet to the left side till the collector
frame there should be 10 cm overhang left for the lateral sheet.
The lateral distance is determined by the shape of the sheets.
For a more accurate illustration the EPDM is excluded.
Содержание FKF 200
Страница 1: ...Assembly instructions Solar collectors FKF 200 240 270 Roof integrated installation...
Страница 43: ...43 Initial operation Schematic drawing of the system construction and piping scheme...
Страница 44: ...44 Initial operation Schematic drawing of the system construction and piping scheme...
Страница 45: ...45 Notes Initial operation...
Страница 46: ...46 Notes Initial operation...