Assembly plain tile clamps
without lead
Use the roof-tile for roof-mounted installation for plain tile roof covering also for slate, shingle and prefa covering.
Fixation of the lower lath 24x80x600 mm with two screws 4x50 mm.
If the lath is placed near the counter lath, the lath 24x80x600 mm
must not be applied.
Adjust the roof-tile laterally so that only one tile must be coarsly
ground. Place the hook so that there is enough space for a covering
tile to avoid grinding.
The tile clamp is fixed with two screws 5x60 mm.
The roof-tile clamp may not rest or rather cause pressure points on
the tile.
If the tile clamp is mounted too low, the added 5 mm timbers can be
placed under the tile clamp.
When mounting the field in regions with snow load zone III and
higher or with expected increased snow loads, it is necessary to
place the roof hooks in the rafter area.
Covering of tile laterally.
Grinding and covering of the tile.
Covering of the remaining tiles.
Further roof-tile clamps in one row must be adjusted exactly
(e.g. by a line mark)
1410004 Roof-tile clamp V2 plain tile without lead
Содержание FKA 240 Series
Страница 1: ...1 Assembly Instructions Solar collectors FKA 240 270 Roof mounted installation...
Страница 36: ...36 Initial operation 0 1 2 3 4 2 5 3 6 7 8 9 6 1 0 3 1 6 2 3 6 6 5 5...
Страница 37: ...37 Initial operation Schematic drawing of the system construction and piping scheme...
Страница 38: ...38 Initial operation Notes...