Z001007/0_4_September 2007
Page BILGE PUMPS-3
BILGE PUMPS
INSTALLATION INSTRUCTION
12. BILGE PUMPES
12.1. GENERAL
To achieve max. Lenz power, pumps and piping are to be chosen as follows.
permanent pipe, copper tube 3/8", outside diameter
From the suction side of the pump a copper tube or reinforced rubber hose is to be laid towards the keel. Provide
the suction pipe at its lower end with a
relief valve
and a
screen
, the latter to permit easy cleaning. The relief
valve prevents a reflux of water of the permanent pipe in case of a damage on the pump wheel.
The bilge pump always should have constant water supply, to avoid dry operation. Connect the permanent pipe
at the delivery side of the pump. Board lead-in at the delivery side of the bilge pump should be at higher level as
the permanent pipe connection.
Equip the permanent pipe with a stop cock. This cock must be closed with inactive engine. Otherwise, sea water
may be pressed into the boat through the permanent pipe, passing the bilge pump, unless the suction pipe is
provided with an effective relief valve. At the lowest points of the pipes drain cocks are to be installed, so that
water can be drained in case of danger of frost.
To avoid pumping out of dirty water in the port or close to the beach, install a cock on the suction pipe of the bilge
pump. If drainage is not required, this cock should let pass the air onto the pum, thus preventing that water is
sucked in from the keel.
length of
boat
(m)
hand bilge pumps
volume flow
(m³/h)
power-driven
bilge pumps
(m³/h)
nominal width of bilge pipes
main bilge/branch bilge pipe
(mm)
< 8
< 10
< 15
< 20
< 24
3
5
5
6
6
5
6
7,5
9
10,5
32
32
40
50
60
40
40
ill.12/1
Содержание 4 Cylinders
Страница 60: ...FUEL SYSTEM Page FUEL SYSTEM 2 Z001007 0_4_September 2007 INSTALLATION INSTRUCTION 7 FUEL SYSTEM NOTES ...
Страница 82: ...SAFETY COVERS Page SAFETY COVERS 2 Z001007 0_4_September 2007 INSTALLATION INSTRUCTION 11 SAFETY COVERS NOTES ...
Страница 86: ...BILGE PUMPS Page BILGE PUMPS 2 Z001007 0_4_September 2007 INSTALLATION INSTRUCTION 12 BILGE PUMPS NOTES ...
Страница 90: ...CABIN HEATING Page CABIN HEATING 2 Z001007 0_4_September 2007 INSTALLATION INSTRUCTION 13 CABIN HEATING NOTES ...
Страница 100: ...CONTROL STATION Page CONTROL STATION 2 Z001007 0_4_September 2007 INSTALLATION INSTRUCTION 15 CONTROL STATION NOTES ...
Страница 168: ...APPENDIX Page APPENDIX 2 Z001007 0_4_September 2007 INSTALLATION INSTRUCTION 18 APPENDIX NOTES ...
Страница 170: ...APPENDIX Page APPENDIX 4 Z001007 0_4_September 2007 INSTALLATION INSTRUCTION THIS PAGE IS INTENTIONALLY BLANK ...
Страница 172: ...APPENDIX Page APPENDIX 6 Z001007 0_4_September 2007 INSTALLATION INSTRUCTION THIS PAGE IS INTENTIONALLY BLANK ...
Страница 173: ...Z001007 0_4_September 2007 Page APPENDIX 7 APPENDIX INSTALLATION INSTRUCTION ...
Страница 174: ...APPENDIX Page APPENDIX 8 Z001007 0_4_September 2007 INSTALLATION INSTRUCTION THIS PAGE IS INTENTIONALLY BLANK ...