22
4.3.2
Finishing
- Using the internal pressure buttons 'long in' and 'long out' set the lateral guide at the beginning, half-way and at the
end of the stroke. Check the play between the fixed and the moveable tube. The play must be the same in all three
positions. It may be necessary to equalise the play using filling plates. Also check longitudinal positioning
- Using ' long in' and 'long out' place the lateral guide in the middle. Using a Ø16 drill take over the holes in the rail.
Position the anchors and fasten them.
- Remove the foot protecting plate (FIG. B.1 and 13) and fit the guides (FIG. B.4), adjust the clearance between guides
and rail to approx. 1 to 2 mm by means of the slotted holes. Reinstall protecting plates.
- Using 'long in' and 'long out', again check the play all around.
- Fasten the control and hydraulic hoses using cable bands.
- The hoses are of a standard length; if they are too long, they can be hung rolled up around the hydraulic unit before
the casing is installed.
- The Combilok can be permanently connected to the mains by a recognized mechanic. If connection is made to a 3 x
400V without neutral conductor, the Combilok will not function.
4.3.3
Start-up
The Combilok is ready for use. Park and lock the vehicle according to the operating instructions (see para 2.2).
5.
SERVICE
5.1
GENERAL
NB: all activities carried out by persons other than those of the service department and the consequences of such
activities are entirely at the Combilok user's own risk.
The fault diagnosis below can be used for localising defects. In the event of doubts the user should contact the service
department.
5.2
TROUBLE SHOOTING
COMBILOK DOES NOT LOCK OR BLOCK
A.
No mains voltage.
See relevant table.
B.
No control voltage.
See relevant table.
C.
Combilok not in stop position.
Press 'Release vehicle' button 1 x.
D.
Release dock not present (green light at symbol
is out).
Dock leveller is not in stop position or door is not closed.
E.
Oil level too low.
Top up, see inspection and maintenance chapter 3.
F.
Air in pump (only possible after the tank has
been empty).
Open the by-pass valve (place handle in line with pipe)
and operate internal 'long out' for 1 minute.
G.
Max. pressure valve opens against overload.
Max. pressure not set correctly; have service department
set correctly.
H.
Pump has too little yield.
Have pump replaced by service department.
Содержание COMBILOK
Страница 2: ......
Страница 53: ......
Страница 55: ...51 FIG A ...
Страница 57: ...53 FIG B ...
Страница 59: ...55 FIG C ...
Страница 63: ...59 FIG F ...
Страница 65: ...61 FIG G ...
Страница 69: ...65 FIG J ...
Страница 73: ......