Page 14 | Stellar
®
108-12-20/36 Shuttle Owner’s Manual
1. Route hose line from the reservoir to the pump (See hose kit drawing for details).
2. Route hose line from the pump to the valve bank (See hose kit drawing for details).
3. Route hose line from the valve bank to the reservoir (See hose kit drawing for details).
4. Route hose line from the valve bank and the hooklift (See hose kit drawing for details).
Note: If using the Power Beyond feature for additional function, see “Power Beyond VDM8
Valve” later in this chapter for further details.
Notes on hose line routing:
• Protect these lines with hose wrap when necessary.
• Keep these lines away from sharp edges.
• Keep these lines away from the exhaust or other temperature extreme items.
• Keep these lines away from the driveshaft or other moving items.
Step 9: Route hydraulic hoses.
Face Seal (A)
Stellar
®
PN
Hose
Size
Fitting
Size
Stellar
®
PN
O-ring Boss (B)
#4
C2027
D1245
#6
C2028
D1246
#8
C2029
D1247
#10
32223
D1248
#12
D1244
D1249
#16
1”
3/4”
5/8”
1/2”
3/8”
1/4”
D1250
B
A
Face Seal/O-Ring Size Chart
Содержание 108-11-20
Страница 6: ...Page vi Stellar 108 12 20 36 Shuttle Owner s Manual This page intentionally left blank...
Страница 8: ...Page 2 Stellar 108 12 20 36 Shuttle Owner s Manual Acceptable Subframe Dimensions Model 108 12 20 36...
Страница 21: ...Stellar 108 12 20 36 Shuttle Owner s Manual Page 15 PRESSURE FROM PUMP RETURN TO TANK Hose Kit PN 81916...
Страница 39: ...Stellar 108 12 20 36 Shuttle Owner s Manual Page 33 Optional Tab Alarm Wire Harness PN 26291...
Страница 40: ...Page 34 Stellar 108 12 20 36 Shuttle Owner s Manual Optional Proximity Switch Wire Harness PN 26416...
Страница 41: ......
Страница 42: ......
Страница 43: ......
Страница 44: ...Subject to Change without Notification 2021 Stellar Industries Inc...