![SteelMax Rail Runner 2 Скачать руководство пользователя страница 18](http://html.mh-extra.com/html/steelmax/rail-runner-2/rail-runner-2_operators-manual_1370102018.webp)
Rail Runner 2
Rail Runner 2
– Operator’s Manual
18
3.6. Connecting to the welding circuits
The carriage can control two torches by using the arc ignition cable plugged into the
arc ignition socket. To do this, refer to the diagram from Fig. 10 and connect one
blue-jacketed wire to one terminal of the welding circuit. Then, connect the other
blue-jacketed wire to the other terminal of the same circuit. To control the second
torch, connect the green-jacketed wires to the terminals of the second welding circuit.
Fig. 10.
Connecting the arc ignition cable to welding circuits
Make sure that the arc ignition cable is connected correctly. To do this, turn on the
power of the carriage, and then set the arc ignition switch to TEST. This should ena-
ble the arc for a while.
B
lue
B
lue
Gr
e
e
n
Gr
e
e
n
Welding circuit 2
Welding circuit 1
Содержание Rail Runner 2
Страница 38: ...Rail Runner 2 Rail Runner 2 Operator s Manual 38 M6x20 M6x16 M6x16 M6x35 6 4 6 4 M6x20 M6x16 6 4 ...
Страница 52: ...Rail Runner 2 Rail Runner 2 Operator s Manual 52 6 WIRING DIAGRAM ...
Страница 53: ...Rail Runner 2 Rail Runner 2 Operator s Manual 53 ...
Страница 54: ...Rail Runner 2 Rail Runner 2 Operator s Manual 54 ...
Страница 55: ...Rail Runner 2 Rail Runner 2 Operator s Manual 55 ...