Page 3 of 3
939501507 Rev A
2.
1.
CAUTION: Do not obstruct label adhered to bottom of channel!
INSTALLATION OF “AMP” MOUNTING
BRACKET INTO ENERGY MANAGE-
MENT CHANNEL
1.
Install “AMP” flexmode module kit into bracket
and wire back of connectors.
2.
Clip “AMP” mounting bracket into cutout, at the
bottom of energy management channel, (either end).
“AMP” MOUNTING
BRACKET
“AMP” FLEXMODE
MODULE KIT
“AMP” MOUNTING BRACKET
WITH “AMP” FLEXMODE MODULE
KIT INSTALLED
ENERGY MANAGEMENT
CUTOUT