background image

Page 3 of 3

939501507 Rev A

2.

1.

CAUTION:  Do not obstruct label adhered to bottom of channel!

INSTALLATION OF “AMP” MOUNTING 
BRACKET INTO ENERGY MANAGE-
MENT CHANNEL

 

1.

  Install “AMP” flexmode module kit into bracket 

and wire back of connectors.

2.

  Clip “AMP” mounting bracket into cutout, at the

bottom of energy management channel, (either end).

“AMP” MOUNTING
BRACKET

“AMP” FLEXMODE
    MODULE KIT      

“AMP” MOUNTING BRACKET
WITH “AMP” FLEXMODE MODULE
KIT INSTALLED

ENERGY MANAGEMENT 
CUTOUT

Отзывы: