Starter ARKANE Скачать руководство пользователя страница 38

 

 
 

 
 

- 37 - 

 MU0091.B 

 

 

 
 

The  crane  ropes  below  are  delivered  by 
default with a red marking for the end of rope: 

Les câbles de potences ci-dessous sont livrés 
par  défaut  avec  un  marquage  rouge  pour  la 
fin de déroulement : 

 
 
 

Modèle 

Synthetic rope /  

Câble synthétique 

Steel wire rope /  

Câble acier 

4 m 

10 m 

4 m 

10 m 

ARKANE 250 EL 

GRU00345 

ACTC0283 

ACTC0284 

ACTC0059 

ACTC0071 

ARKANE 500 EL 

GRU00346 

ACTC0400 

ACTC0295 

ACTC0060 

ACTC0052 

 
 
 
 

 

 

 

11.3  Wire rope Spare parts  

 

11.3 

Pièces de rechange : 

Câbles 

 

11.4  Crane Spare parts  

 

11.4 

Pièces de rechange : 

Potence 

 

For  electrical  cranes  trolley,  only  the  parts 
reported  below  can  be  changed  by  the  user. 
For  changing  another  element  of  the  trolley, 
please return the equipment  

Pour les chariots de potence électrique, seule 
les  pièces  repérées  ci-après  peuvent  être 
changée par l’utilisateur. Pour le changement 
d’un  autre  élément  du  chariot,  merci  de 
retourner le matériel en SAV 

  

Содержание ARKANE

Страница 1: ...ence Chaque op rateur doit le lire et le comprendre T l 33 01 39 09 27 66 Maintenance Repair Original replacements parts Service contracts Technical and safety survey Maintenance et Entretien R parati...

Страница 2: ...ation 20 5 GENERAL USE INSTRUCTION 23 6 LOAD LIMITER AND LIMIT SWITCHES 25 6 1 Load limiter 25 6 2 Limit switches 25 7 VISUAL MOTOR WARM UP INDICATOR 27 8 SPECIAL INSTRUCTION ABOUT ROPE USE 28 9 ROPE...

Страница 3: ...TION GENERALES 23 6 LIMITATION DE CHARGE ET FIN DE COURSES 25 6 1 Limitation de charge 25 6 2 Fin de courses 25 7 INDICATEUR VISUEL D ECHAUFFEMENT MOTEUR 27 8 CONSIGNES PARTICULIERE RELATIVES A L UTIL...

Страница 4: ...al requests please contact our sales department Merci d avoir achet une potence ARKANE le made in France by STARTER Cette nouvelle gamme de potences con ue et fabriqu e dans nos usines SAINT OUEN L AU...

Страница 5: ...BILITY ONLY AUTHORIZED DEALERS AND QUALIFIED MECHANICS MAY ADJUST OR REPAIR THE PRODUCT AVANT TOUTE UTILISATION LE PERSONNEL EN CHARGE DE L INSTALLATION ET DE L UTILISATION DU MAT RIEL DOIT IMP RATIVE...

Страница 6: ...must carry out the training necessary of the operators Operators must always work in conformity with this manual instructions Operators must always start loads lifting with the lowest speed of liftin...

Страница 7: ...rdance with the requirements of this manual Eviter le pianotage sur les organes de commande Il est interdit de lever des personnes L op rateur doit tre attentif la man uvre effectu e et avoir une visi...

Страница 8: ...block a load during transport Enroulement du c ble sur le tambour Toujours respecter les tours morts sur le tambour Respecter la charge maximale de la potence Cf CMU indiqu e sur le chariot Ne pas st...

Страница 9: ...e would damage the synthetic rope and affect its strength 2 2 Consignes de s curit particuli res propres au c ble Ne jamais toucher le c ble synth tique ou acier lorsqu il est sous charge Le port de g...

Страница 10: ...h 2 Quick sockets for electric versions Les potences ARKANE se composent de D un pied en tube acier rond D un bras pivotant en tube acier rectangulaire D un chariot de translation quip d un guide c bl...

Страница 11: ...ngueur de c ble disponible synth tique ou acier Energy Alimentation Weight Masse totale kg ARKANE 250 MA GRU00350 250 1 5m Manuelle Manual 50 ARKANE 250 EL GRU00345 250 4m ou 10m 4m ou 10m 12V 67 ARKA...

Страница 12: ...11 MU0091 B...

Страница 13: ...t fix e la potence doit tre correctement dimensionn e et r alis e Les sollicitations prendre en compte dans les calculs sont les suivantes ARKANE 250 ARKANE 500 Low fixing point Point de fixation bas...

Страница 14: ...ts For the Upper fixing point of the crane you have in the kit two collars and a fixation support that will have to attach to a rigid point of the vehicle able to resist to the efforts described in Ch...

Страница 15: ...14 MU0091 B...

Страница 16: ...upe circuit 1 40A fuse and its support 1 fusible 40A et son porte fusible 1 quick socket 2x 35mm pods for battery connection and its fixation bolts 1 prise quick 2 cosses 35mm pour la liaison batterie...

Страница 17: ...of your crane can be carried out on our workshop in this case please contact our sales department Pour le raccordement lectrique veuillez respecter le sch ma ci dessous la pose compl te de votre poten...

Страница 18: ...send the trolley to after sales service 4 6 Test statique Le c ble de travail est livr s par ment et ne doit pas servir lors du test r glementaire Un c ble d essai de m me nature que votre c ble de tr...

Страница 19: ...y a pas de d formation plastique et notamment aux niveaux des points de fixation sur le v hicule 9 Enlever le poids de surcharge et reposer la charge 10 Enlever le c ble de test et installer le c ble...

Страница 20: ...19 MU0091 B...

Страница 21: ...roper winding the rope can be damaged on sharp edges and break 4 7 Fixation du c ble Le maintien du c ble sur le tambour se fait en partie par l adh rence entre le c ble et le tambour Dans le cas d un...

Страница 22: ...limit switches 1 Pass the rope through the rubber stop until you come into contact with the hook Avant d enrouler le c ble il est imp ratif d installer la but e caoutchouc livr e avec la potence Cell...

Страница 23: ...pe leaving space to insert the ball If you have lost the ball you can replace it with an M4 nut Insert the ball into the loop and pull the cable until the ball disappears 4 5 Resserrer la boucle en ti...

Страница 24: ...Y RESPECT the maximum load of your ARKANE crane 5 CONSIGNES D UTILISATION GENERALES Les freins du v hicule doivent tre serr s Utiliser la b quille en option Des pr cautions suppl mentaires doivent tre...

Страница 25: ...control for electrical crane Votre potence ARKANE est maintenant pr te l emploi D ployer votre potence et brancher votre t l commande pour les versions lectriques Emergency stop Arr t d urgence UP mo...

Страница 26: ...ed by a red marking color on the rope so it is visual and not mechanical This red marking guarantees the number of dead wraps on the drum It is imperative to always check the rope when your load is co...

Страница 27: ...26 MU0091 B Higher limit switch Fin de course haut Lower Limit switch Fin de course bas STOP YES OUI YES OUI NO NON...

Страница 28: ...nces lectriques ARKANE sont quip s d un adh sif thermosensible r versible coll sur la carcasse du moteur lectrique Cet adh sif est un indicateur visuel de l chauffement du moteur Apr s plusieurs utili...

Страница 29: ...de travail est n cessaire pour une inspection visuelle visant d terminer si le c ble de votre potence peut continuer tre utilis ou doit tre chang Il est important que le c ble soit r guli rement inspe...

Страница 30: ...s la zone affect e est raide et le c ble a un aspect glac Original rope dimension Encombrement original du c ble Rope decreasing 25 strand volume reduction from abrasion rope should be replaced C ble...

Страница 31: ...ind the rope on the drum following the procedure R aliser sur l extr mit libre du c ble acier ou synth tique le marquage suivant les tapes ci apr s 1 Positionner un scotch en respectant la longueur L...

Страница 32: ...grease every 6 months the articulation between the arm of the crane and the pillar Grease Type NLGI 2 or equivalent Grease nipple type Droit M8 10 1 Graissage Il est conseill de recharger en graisse...

Страница 33: ...nce exempte de salet de graisse d eau et autres substances V rifier tous les boulons de montage et s assurer qu ils sont serr s aux couples recommand s de 79 3Nm Remplacer toute fixation endommag e Co...

Страница 34: ...ool out and check rope Visual check of winch and control Brake test Load limiter test Activit de maintenance Apr s la premi re utilisation Avant chaque utilisation Apr s chaque utilisation Tous les se...

Страница 35: ...ant if there is no continuity Failure of components or wiring inside controller Check for 12v at center pin of remote socket on controller Check continuity of remote lead connector from center pin to...

Страница 36: ...du c blage l int rieur de la bo te relais V rifier qu il y a 12 V la broche centrale de la prise de t l commande de la bo te relais V rifier la continuit du connecteur du fil de t l commande entre la...

Страница 37: ...essous entre 8h30 et 18h00 du lundi au jeudi et vendredi 16h pour assistance Pour recevoir une assistance technique ou par courrier lectronique STARTER SERVICES Groupe DLD Parc d activit du Vert Galan...

Страница 38: ...9 ACTC0071 ARKANE 500 EL GRU00346 ACTC0400 ACTC0295 ACTC0060 ACTC0052 11 3 Wire rope Spare parts 11 3 Pi ces de rechange C bles 11 4 Crane Spare parts 11 4 Pi ces de rechange Potence For electrical cr...

Страница 39: ...38 MU0091 B...

Страница 40: ...39 MU0091 B...

Страница 41: ...40 MU0091 B...

Страница 42: ...41 MU0091 B...

Страница 43: ...42 MU0091 B...

Страница 44: ...suits your crane 11 5 Option Base potence Il est possible de raccourcir la hauteur de la potence pour l adapter votre v hicule Pour cela il faut couper le pied et faire une encoche comme indiqu ci des...

Страница 45: ...44 MU0091 B 11 6 Declaration of conformity CE 11 6 D claration de conformit CE...

Страница 46: ...45 MU0091 B NOTE...

Страница 47: ...46 MU0091 B NOTE...

Страница 48: ...EN L AUMONE FRANCE T l 33 0 1 39 09 19 19 Fax 33 0 1 39 09 27 57 e mail starter groupedld com Site internet http www groupedld com Maintenance Repair Original replacements parts Service contracts Tech...

Отзывы: