Technical Primer - Aurora
7
Maintenance
7.1
Routine Maintenance
The following table is the recommended maintenance cycle.
According to the country where the charging equipment is installed and operated, the cycle needs
to be changed. Please adhere to the relevant laws and regulations at the location.
Check Item
Cycle
Handling
Charging connector
Every month
Check
Leakage switch protection
Every month
Check
Emergency stop function check
Every month
Test
Dust inspection of control board
Every month
Check and Clear
7.2
Charging control logic
7.2.1
Logic of Building-blocks
Wanbang Digital Energy Co.Ltd
22
Содержание Aurora 11kW
Страница 1: ...Technical Primer Aurora 11kW ...
Страница 2: ...2 Wanbang Digital Energy Co Ltd Installation Manual ...
Страница 29: ...30 Wanbang Digital Energy Co Ltd Installation Manual ...