Technical Primer - Aurora
5
Commissioning the charging pile
5.1
Safety instructions before commissioning
• Ensure that the charging pile is correctly connected to the power source according to the re-
quirements of this manual.
• Ensure that the power distribution system is individually protected by appropriate circuit break-
ers (Residual Current Fuses).
• Ensure that the charging pile installation complies with this manual.
• Ensure that the enclosure is always closed during normal use.
• Check whether the charging cable is twisted and whether the cable, plug, and casing are intact.
5.2
Wiring steps before commissioning
• Unscrew the M4 hexagon socket countersunk head screw at the bottom. Remove the decorative
cover and open the wiring window cover.
• Insert the SIM card supported by the local operator into the slot. (Figure 13a)
(a) SIM card slot
(b) Incoming wire connections
Figure 13: Making Connections
• The incoming wire passes through the metal waterproof joint at the bottom of the pile. (Figure
13b)
• Use six M4*12 screws to tighten the wiring compartment cover, and two M4*12 screws to tighten
the crimping ferrule. Note that there are two positions for the crimping ferrule, depending on
the thickness of the incoming cable. (Figure 14)
Wanbang Digital Energy Co.Ltd
17
Содержание Aurora 11kW
Страница 1: ...Technical Primer Aurora 11kW ...
Страница 2: ...2 Wanbang Digital Energy Co Ltd Installation Manual ...
Страница 29: ...30 Wanbang Digital Energy Co Ltd Installation Manual ...