Technical Primer - Aurora
(a) Charger installation
(b) Thread hook and guard installation
Figure 10: Pile settings for Aurora
6. Drill 4 holes with A diameter of 10mm and A depth of 150mm on the concrete floor, and the
spacing between hole centers is 100mm x 200mm. Use four M10*120 expansion screws to
install and tighten the charging pile posts, as shown in Figures 11a and Figure 11b.
(a) Fixed base
(b) Fixed column
Figure 11: Pile settings for Aurora
7. Place the rear decorative cover on the bottom plate of the column. (Figure 12a)
8. Insert the front decorative cover into place from top to bottom and the back decorative cover,
and fix both sides of the front decorative cover with two M4*12 flower-shaped composite screws
(Torque: 1.4 - 1.6 N.m) with column core in Figure 12b.
(a) Install the rear decorative cover
(b) Fixed the decorative cover
Figure 12: Pile settings for Aurora
Wanbang Digital Energy Co.Ltd
16
Содержание Aurora 11kW
Страница 1: ...Technical Primer Aurora 11kW ...
Страница 2: ...2 Wanbang Digital Energy Co Ltd Installation Manual ...
Страница 29: ...30 Wanbang Digital Energy Co Ltd Installation Manual ...