![Stahl EXLUX 6409/1 Series Скачать руководство пользователя страница 25](http://html1.mh-extra.com/html/stahl/exlux-6409-1-series/exlux-6409-1-series_operating-instructions-manual_1357834025.webp)
260520 / 640960300090
2018-11-08·BA00·III·en·02
Commissioning
25
Emergency Luminaire with LED
Series EXLUX 6409/1
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
EN
9
Commissioning
Before commissioning, ensure the following:
• Check the mounting and installation.
• Inspect enclosure for damage.
• If necessary, remove foreign bodies.
• If necessary, clean the connection chamber.
• Check if the conductors have been inserted correctly.
• Check if all screws and nuts have been tightened firmly.
• Check whether all the cable entries and stopping plugs have been tightened firmly.
• Check if all conductors have been clamped firmly.
• Check if the line voltage and the rated operational voltage are consistent.
• Check if the permissible conductor diameter for the corresponding cable entries have
been used.
• Check if the device is closed according to regulations.
• Check if the battery is connected.
DANGER
Explosion hazard due to incorrect installation!
Non-compliance results in severe or fatal injuries.
• Check the device for proper installation and function before
commissioning.
• Comply with the national regulations.
Содержание EXLUX 6409/1 Series
Страница 34: ......