Commissioning
Before commissioning, ensure the following:
• Check the mounting and installation.
• Inspect enclosure for damage.
• If necessary, remove foreign bodies.
• If necessary, clean the connection chamber.
• Check if the conductors have been inserted correctly.
• Check if all screws and nuts have been tightened firmly.
• Check if all drilled holes are closed.
• Check whether all the cable entries and stopping plugs have been tightened firmly.
• Check if all conductors have been clamped firmly.
• Check if the line voltage and the rated operational voltage are consistent.
• Check if the permissible conductor diameter for the corresponding cable entries have
been used.
• Check if the device is closed according to regulations.
• Check whether the bracket mounting & cover mounting screws are tightened with
proper torque.
DANGER
Explosion hazard due to incorrect installation!
Non-compliance results in severe or fatal injuries.
• Check the device for proper installation before commissioning.
• Comply with national regulations.
DANGER
Explosion hazard due to incorrect installation!
Non-compliance results in severe or fatal injuries.
• Carry out the restricted breathing test prior to first commissioning for
series 6525/21 (nR version).
(See chapter "Restricted breathing test")
NOTICE
Malfunction or device damage caused by condensation.
Non-compliance can result in material damage!
• operate the luminaire continuously or periodically over extended periods of time.
• avoid thermal bridges.