How to Start Steaming
1
3
5
2
4
6
The operator then has to agree with the Owner/
Operator Agreement before he can move on to the
Field Work screen.
The machine will prepare for field work.
This will take 5-30 minutes depending on how full the
boiler is, and the starting temperature of the water.
The steam purge valve will open.
You have arrived at the Field Work screen!
Turn on the machine by flipping the red rocker
switch.
Press Start All.
Press Confirm Start (The machine needs to have water
and fuel before you can start steaming).
Press Continue.