
© 2021 Staheli West
37
1
3
5
2
4
Attach blowdown hose, light harness, camera harness,
hydraulic lines, steam hoses, and other equipment if
necessary.
Be sure to adjust hitch height for optimal PTO angles.
Never operate with harsh PTO angles.
Insert and secure hitch pin.
Secure chain so it won’t drag through the windrow.
Make sure the PTO knuckles are lined up on both the
DewPoint machine and the baler. Failure to do so will
result in heavy vibrations and excessive wear.
DewPoint Hookup to Baler
Содержание DewPoint 331
Страница 213: ... 2021 Staheli West 204 Notes ...
Страница 214: ... 2021 Staheli West 205 Notes ...
Страница 215: ... 2021 Staheli West 206 Notes ...