33
STEP 6
Now also fix the poles with the guy ropes. To do this, tie the ropes to the corner connectors (7), guide the ropes
through the eyelet on the roof tarpaulin to the outside and fasten the rope to the ground using the spiral
pegs. Finally, tension the side and gable walls to the ground using the short ground pegs.
Содержание GIANT PROFESSIONAL PVC
Страница 1: ...1 GIANT PROFESSIONAL PVC 6x6m 6x8m 6x10m 6x12m AUFBAUANLEITUNG ASSEMBLY INSTRUCTION...
Страница 2: ...2 WILLKOMMEN BEI STABILEZELTE...
Страница 14: ...14 SCHRITT 1 Legen Sie die Stangen und Verbindungselemente gem Zeichnung auf dem Boden aus...
Страница 28: ...28 STEP 1 Lay out the poles and connectors on the floor according to the drawing...