
Figure 32.
DC side load connection
2.5
Startup procedure
After connection and debugging initialization, you can perform the startup procedure.
An embedded finite state machine handles this procedure. It consists of different states that perform a preliminary
check of the converter and the precharge of the capacitor. Then the burst operation boosts the output voltage.
The
reference design allows managing the complete startup procedure.
However, a controlled step-by-step procedure is available. It is useful during the preliminary test or after
hardware/sw modification.
Figure 33.
Startup procedure
2.5.1
Controlled startup procedure
The AC power supply is slowly increased to verify the procedure step step-by-step as shown below.
UM2975
Startup procedure
UM2975
-
Rev 1
page 20/63