Step 1.
Use the same ETS project and configuration of
boards.
Figure 117.
ETS project topology
Step 2.
Right-click on the device to initiate ETS full download.
Figure 118.
ETS full download
Step 3.
Wait for the following message to appear.
Figure 119.
Press the programming button message
Step 4.
Long push the
blue button until download starts.
Figure 120.
Starting the download
UM2920
ETS5 setup through Tapko USB dongle
UM2920
-
Rev 1
page 58/71