Figure 33.
DC voltage sensing test procedure (2 of 2)
2.5.3
AC connection
A correct ABC sequence is mandatory for the proper operation of the power converter.
Figure 34.
AC main connection and sequence
2.5.4
DC connection
The figure below shows the output DC connection. Ensure to apply the correct polarity.
UM2979
Preliminary test procedure
UM2979
-
Rev 1
page 20/70