background image

RZ3-GB10

RZR XP1000 & 2015+ RZR900

Glove Box Subwoofer Enclosure

SSV WORKS, 201 N. Rice Ave Unit A, Oxnard, CA 93030

www.SSVworks.com     |     Phone: 818-991-1778     |     Fax: 866-293-6751

!

Please read and understand these 

instructions completely before 

installation to avoid possible injury, or 

damage to the accessory or vehicle. 

WARRANTY INFORMATION:

All SSV Works enclosures are covered by a limited lifetime warranty against defects 

in material or workmanship. All SSV Works Electronics are covered by a limited 1 year 

warranty against defects in material or workmanship. All SSV Works Speakers are 

covered by a limited 1 year warranty against defects in material or workmanship. Labor 

for replacement of defective components is not covered. Contact SSV Works for further 

warranty information.

1.  WP-RZ3GBS10 Enclosure
2.  M6 x 1.0 Screws x 11 

(Long)

3.  M6 x 1.0 Screws x 2 (Short)

TOOLS NEEDED FOR INSTALLATION

INSTALLATION NOTES

PARTS LIST

PARTS LIST IMAGES

4.  M6 Washers x 13
5.  Flat Mounting Brackets x 2
6.  “L” Bracket x 1
7.  Glove Box Door bracket x 1 

The use of a thread locker is recommended on all screws to prevent loosening due to vibration. If the vehicle has SSV Works front kick panels 

(RZ3-FKP65/RZ3-F65) installed, the passenger side kick panel will need to be removed prior to installation of the RZ3-GB10.  Removal of the 

passenger fender is not required (Step 3); however it will make the installation and alignment of the RZ3-GB10 easier. 

2.   M6 x 1.0 Screws x 11 

(Long) 

7.    Glove Box Door 

Bracket x 1 

3.   M6 x 8mm Screws x 2 

(Short)

4.   M6 Washers x 13

5.   Flat Mounting 

Brackets x 2

1.    WP-RZ3GBS10 Enclosure 

(door not included)

6.   “L” Bracket x 1

- Wire Crimpers
- Wire Strippers
- 10mm Socket or Wrench
- Drill with 1/8” and 1/4” Drill bits

- T-30 Torx Driver 
- T-40 Torx Driver
- #3 Phillips Screwdriver
- #2 Phillips Screwdriver
- Panel removal tool

Содержание RZ3-GB10

Страница 1: ...2 M6 x 1 0 Screws x 11 Long 3 M6 x 1 0 Screws x 2 Short TOOLS NEEDED FOR INSTALLATION INSTALLATION NOTES PARTS LIST PARTS LIST IMAGES 4 M6 Washers x 13 5 Flat Mounting Brackets x 2 6 L Bracket x 1 7 Glove Box Door bracket x 1 The use of a thread locker is recommended on all screws to prevent loosening due to vibration If the vehicle has SSV Works front kick panels RZ3 FKP65 RZ3 F65 installed the p...

Страница 2: ...o T40 Torx bolts that secure the front dash Carefully release the panel clips along the perimeter of the dash by pulling toward the rear of the vehicle remove front dash and set aside D Remove the two 10mm bolts the secure factory glove box and remove the factory glove box RZ3 GB10 A C B D SSV HOLE PATTERN KICKER HOLE PATTERN FOR UNLOADED ENCLOSURES Pink hole pattern SSV Works Subwoofer Blue hole ...

Страница 3: ...hicle It should sit approximately 1 4 from the factory glove box mount If not properly installed the dash of the vehicle will not securely push back into position I For 2015 up model year vehicles install the supplied bracket using the short screws provided and adjust forward or back so glove box latch closes tight H Loosely install the bottom L bracket align the mounting hole with the factory bun...

Страница 4: ...nd the to the from the speaker wire to the amplifier If using with an SSV Works complete system refer to the amplifier wiring instructions for more detailed wiring information Amplifier K Route the speaker wire away from any moving parts and any sharp metal then connect to the amplifier K J Attach the factory glovebox door and all panels previously removed J ...

Отзывы: