Srne SR-EOV24 Скачать руководство пользователя страница 1

SRNE Solar Co., Ltd.

4-5F,13A Wutong Island, Neihuan Road, Xixiang, Shenzhen,China

T: +86 0755-26458295

F: +86 0755-27325578

E: [email protected]

W: www.srnesolar.com

Page 1 of 51

File version: V1.0

SR-EOV24 Vertical Energy Storage System

User Manual

V1.0

Содержание SR-EOV24

Страница 1: ...13A Wutong Island Neihuan Road Xixiang Shenzhen China T 86 0755 26458295 F 86 0755 27325578 E master szshuori com W www srnesolar com Page 1 of 51 File version V1 0 SR EOV24 Vertical Energy Storage S...

Страница 2: ...oduct should be used in compliance with local standards laws and regulations because any non compliance with the use may lead to personal injuries and property loss The drawings provided in this Manua...

Страница 3: ...of risk which if not avoided could result in minor or moderate injuries NOTICE Warning information about device or environment safety If not avoided equipment damage data loss performance degradation...

Страница 4: ...regulations and codes shall be followed The safety precautions in this Manual are only supplements to local laws regulations and codes The Company shall not be liable for any of the following circumst...

Страница 5: ...OTICE After the device is installed the empty packing materials such as cartons foam plastics and cable ties shall be removed from the device area 2 1 3 Personnel Safety When operating the device appr...

Страница 6: ...ot stand lean or sit on the device Do not damage any modules of the device 2 2 Personnel Requirements The personnel in charge of installation and maintenance must be strictly trained to understand all...

Страница 7: ...emoving the device the protective grounding wire must be removed at last It is forbidden to destroy the grounding conductor It is forbidden to operate the device without a grounding conductor installe...

Страница 8: ...taic mains battery and loads and has the function of photovoltaic and mains charging The photovoltaic charging module adopts the latest optimized MPPT tracking technology which can quickly track the m...

Страница 9: ...requency Charge Current Max PV Power SR EOV24 5 0S S1 5 12kWh 3500W 230Vac 50Hz 0 80A 4000W SR EOV24 5 0U S1 5 12kWh 3500W 120Vac 60Hz 0 80A 4000W SR EOV24 10 0S S1 10 24kWh 3500W 230Vac 50Hz 0 80A 40...

Страница 10: ...y level 5 0 The system capacity is 5kWh 10 0 The system capacity is 10kWh Output voltage U The output voltage is 110V S The output voltage is 220V Product category S Energy storage system E Energy sto...

Страница 11: ...rtically mounted EOS wall mounted System voltage 24 24V system 48 48V system Energy storage capacity level 5 0 The system capacity is 5kWh 10 0 The system capacity is 10kWh Energy storage battery type...

Страница 12: ...E master szshuori com W www srnesolar com Page 12 of 51 File version V1 0 3 5 Appearance Description 3 5 1 Dimentions Inverter dimensions L W H 600 184 500mm Battery dimensions L W H 600 184 610mm Bas...

Страница 13: ...onnect battery USB RS485 1 Dry contact Start generator PV input port AC output port AC input port PV input switch AC output switch AC input switch Battery switch Battery Negative Battery Positive Cool...

Страница 14: ...szshuori com W www srnesolar com Page 14 of 51 File version V1 0 3 5 3 Energy Storage Battery Module Turn On Off LED SOC LED ALM LED RUM Address RS232 RS485 1 Connect inverter CAN Connect inverter RS4...

Страница 15: ...n Scenarios The lithium iron phosphate batteries with high performance and long service life are used in the energy storage module Meanwhile the modular structure design is adopted Each energy storage...

Страница 16: ...File version V1 0 When the mains is disconnected or stops working the battery supplies power to the load through the power module 4 1 2 Application Scenarios with Only Photovoltaic but No Mains Power...

Страница 17: ...e 17 of 51 File version V1 0 4 1 3 Complete Application Scenarios During the day the mains and photovoltaic simultaneously charge the battery and supply power to the loads At night the mains supplies...

Страница 18: ...en the battery is under voltage or lower than the set value of parameter 5 System Installation 5 1 Inspections before Installation Inspection of outer package Before opening outer package of the energ...

Страница 19: ...tity Specification Source 1 Inverter 1 3 5kW 24V 110V 220V Inverter Package 2 Battery N 5 12kWh 25 6V Battery Package 3 Base 1 680 184 80mm Inverter Package 4 Mounting Frame 2 N 80 44mm Battery Packag...

Страница 20: ...tor will be high Therefore do not install them in a place that is easy to touch Do not install in areas where flammable and explosive materials are stored If the energy storage is installed in areas w...

Страница 21: ...gloves shall be worn During drilling the device should be shielded to prevent debris from falling into the device After drilling the debris shall be cleaned up in time When handling any heavy objects...

Страница 22: ...llation location please choose a flat ground and a solid wall as the installation location First determine the installation position of the base the fixed size is 648mm Second determine the installati...

Страница 23: ...holes on the wall 8 depth 45 50mm Tap the M8 screw into the above hole and screw on the nut 5 4 3 Mounting the base Fasten the base to the expansion screw 5 4 4 Install Battery Pack CAUTION Place the...

Страница 24: ...ihuan Road Xixiang Shenzhen China T 86 0755 26458295 F 86 0755 27325578 E master szshuori com W www srnesolar com Page 24 of 51 File version V1 0 5 4 5 Install Inverter The installation method of the...

Страница 25: ...between AC output and power module Cable diameter 10mm2 7AWG Prepare by the user itself 6 2 Internal Electrical Connection of Energy Storage 6 2 1 Connecting Power Cord Before connecting the energy st...

Страница 26: ...Ltd 4 5F 13A Wutong Island Neihuan Road Xixiang Shenzhen China T 86 0755 26458295 F 86 0755 27325578 E master szshuori com W www srnesolar com Page 26 of 51 File version V1 0 Power Cable Power Cable...

Страница 27: ...r szshuori com W www srnesolar com Page 27 of 51 File version V1 0 6 2 3 Connecting Signal Line The signal line delivered with the product together shall be used to connect RS485 2 interface for each...

Страница 28: ...in parallel the address of the energy storage battery module needs to be set The address is set to 1 4 and the address of each module cannot be repeated NOTICE 6 3 External Electrical Connection of En...

Страница 29: ...please pay attention to L and N and avoid short circuit 6 3 3 Connecting Photovoltaic Input According to the cable sequence and terminal position shown in the figure below correctly connect the PV in...

Страница 30: ...s Yes No 3 The power cord is correctly connected The positive and negative terminals are connected correctly without any missing Yes No 4 The signal line is correctly connected The signal line is conn...

Страница 31: ...rmation turn on the switch of the energy storage battery module If there are multiple modules please turn on the power switch one by one according to the address sequence After the power switch is tur...

Страница 32: ...king3 Over Discharge Protection OFF OFF Over Current Short Current OFF ON LED blinking description Blinking LED ON LED OFF Blinking1 0 25S 3 75S Blinking2 0 5S 0 5S Blinking3 0 5S 1 5S 7 2 3 Capacity...

Страница 33: ...ormally the indicator lights are described as follows Indicators introduction Indicator lights Color State Description AC INV Yellow Always ON Mains output Blinking Inverter output CHARGE Green Blinki...

Страница 34: ...age 2 PV TEMP PV charger heatsink temperature PV OUTPUT KW PV output power 3 PV INPUT V PV input voltage PV OUTPUT A PV output current 4 INPUT BATT A Input battery current OUTPUT BATT A Battery output...

Страница 35: ...battery is under voltage or lower than the set value of parameter 04 02 Output Frequency 50 0 Bypass self adaptation when the mains is connected it automatically adapts to the mains frequency when the...

Страница 36: ...Mains priority charging only when the mains charging fails the PV charging is started SNU PV and Mains hybrid charging PV charging is a priority and when the PV energy is insufficient the Mains charg...

Страница 37: ...ge voltage 28 4V Floating charge voltage setting range 24V 29 2V step 0 2V valid when battery type is user defined 12 Battery over discharge voltage delay off 23 4V Over discharge voltage when the bat...

Страница 38: ...or vented lead acid battery and sealed lead acid battery 17 Battery equalization voltage 29 2V Equalizing charge voltage setting range 24V 29 2V with a step of 0 2V valid for vented lead acid battery...

Страница 39: ...restart when overload is enabled If an overload occurs and the output is turned off the machine will restart after a delay of 3 minutes After it reaches 5 cumulative times the machine will not restart...

Страница 40: ...ss setting range 1 254 32 RS485 1 communication 485 RS485 2 port for BMS communication 33 Battery BMS communication protocol PYL you can choose to match the battery manufacturer s BMS protocol to comm...

Страница 41: ...ker switch between the inverter unit and AC input If installed Step 3 Turn off the breaker switch between the inverter unit and the PV string If installed Step 4 Turn off the battery breaker switch al...

Страница 42: ...rance is damaged or deformed Listen to whether the energy storage has any abnormal sound during running When the energy storage is running check whether the indicator of the energy storage battery is...

Страница 43: ...rrent software protection 11 PvBuckOCHw No Buck overcurrent hardware protection 12 bLineLoss No Mains power down 13 OverloadBypass Yes Bypass overload protection 14 OverloadInverter Yes Inverter overl...

Страница 44: ...t Restart the unit to resume load output Inverter short circuit protection Check the load connection carefully and clear the short circuit fault points Re power up to resume load output PV overvoltage...

Страница 45: ...be disposed in accordance with local safety regulations 13 The battery should be stored and recharged in accordance with this User s Manual 14 Do not reverse polarity of the battery when storing or tr...

Страница 46: ...mmended to clean and maintain the product from time to time When cleaning the dust and stains on the product shall be removed with a piece of soft dry cloth or vacuum cleaner especially when cleaning...

Страница 47: ...110 120Vac Input Voltage Range 90 280Vac 90 140Vac AC Output Rated Output Power 3500W 3500W Maximum Output Current 30A 40A Frequency 50Hz 60Hz Overload Current 35A 45A PV Charge Solar Charge Type MPPT...

Страница 48: ...attery Capacity 200AH Battery Rated Voltage 25 6V Battery Working Voltage Range 22 4 28 8V Maximum Charging Current 150A Maximum Discharging Current 150A DOD 80 Parallel Quantity 4 Designed Life span...

Страница 49: ...f the inverter module is 600 184 500mm the external dimensions of the energy storage battery module is 600 184 500mm the external dimensions of the base module is 680 184 80mm 10 2 Package Dimensions...

Страница 50: ...List NO Picture Item Quantity Specification Source 1 Inverter 1 3 5kW 24V 110V 220V Inverter Package 2 Battery 1 5 12kWh 25 6V Battery Package 3 Base 1 680 184 80mm Inverter Package 4 Mounting Frame...

Страница 51: ...Xixiang Shenzhen China T 86 0755 26458295 F 86 0755 27325578 E master szshuori com W www srnesolar com Page 51 of 51 File version V1 0 9 Power cable 1 560mm 4AWG Battery Package 10 Signal cable 1 700...

Отзывы: