20
Commissioning
CFB/EN (1808) 2.4
4.6
Adjustment of shaft sealing
4.6.1
Stuffing box packing
After the pump is started, the stuffing box packing will show a certain amount of leakage.
Because of the expansion of the packing fibres, this leakage will gradually decrease.
Make sure that the stuffing box packing never runs dry. To prevent this, loosen the nuts
(1810) to the extent that the stuffing box packing leaks by drops. As soon as the pump
has reached the proper temperature (and leakage is still too much) the gland can be
adjusted permanently:
1 Tighten both nuts, one after the other, a quarter turn.
2 Wait 15 minutes after each adjustment before making the next adjustment.
3 Continue in this way until an acceptable leakage by drops has been attained (10/
20 cm
3
/h).
4 Fix the guards (0270).
Adjustment of stuffing box packing has to be done with running pump. Take
great care not to touch moving parts.
4.6.2
Mechanical seal
• A mechanical seal may never show visible leakage.
4.7
Pump in operation
When the pump is in operation, pay attention to the following:
• The pump should never run dry.
• Never use a stop valve in the suction line to control pump output. The stop valve
should always be fully opened during operation.
• Check whether the absolute inlet pressure is sufficient, to prevent vaporization in the
pump.
• Check whether the pressure difference between suction and delivery side
corresponds with the specifications of the pump's duty point.
• A mechanical seal may never show visible leakage.
4.8
Noise
The noise production of a pump depends to a great extent on the operating conditions.
The values stated in paragraph 10.8 "Noise data" are based on normal operation of the
pump, driven by an electric motor. In case the pump is driven by a combustion engine, or
in case it is used outside the normal operation area, as well as in case of cavitation, the
noise level may exceed 85 dB(A). In that case precautions should be taken, like building
a noise-barrier around the unit or wearing hearing protection.
Содержание CombiFlexBloc Series
Страница 2: ......
Страница 4: ...2 EC EN 1712 6 0...
Страница 6: ...4 INT EN 1512 1 2...
Страница 18: ...16 General CFB EN 1808 2 4...
Страница 52: ...50 Dimensions CFB EN 1808 2 4...
Страница 54: ...52 Parts CFB EN 1808 2 4 9 2 Pump construction K1 9 2 1 Sectional drawing M0 Figure 22 Sectional drawing M0...
Страница 78: ...76 ORDFORM 1512 3 3 EN...