20
Installation and preparation start-up
KGE/EN (1711) 6.5
Do the same check, but now on either coupling side, near the shaft. For safety sake,
repeat the check, using an outside caliper (B) at 2 diametrically opposed points on the
half coupling side faces.
3.6
Preparations start-up
Take the following precautions:
• Before commissioning the pump, remove any preservatives and flush the pump with
hot water.
• Check whether the seal chamber is filled with oil. If not, fill with lubricant.
Never allow the seal to run dry !
• Check whether the pump shaft turns freely. Do this by turning the shaft end a few
times by hand.
• Fill the pump with water or the liquid to be handled through the filling plug on top of
the pump until the liquid starts to over flow.
Table 2: Tolerances for aligning coupling [mm]
Outer Ø coupling
V
Va
max
- Va
min
[mm]
Vr
max
[mm]
min [mm]
max [mm]
70 - 80
2
4
0,13
0,13
81-95
2
4
0,15
0,15
96-110
2
4
0,18
0,18
111-130
2
4
0,21
0,21
131-140
2
4
0,24
0,24
141-160
2
6
0,27
0,27
Figure 5:
Alignment tolerances.
Vr
Va
max
Va
min
Содержание Johnson pump
Страница 2: ......
Страница 4: ...2 EC EN 1609 5 9...
Страница 6: ...4 INT EN 1512 1 2...
Страница 10: ...8 KGE EN 1711 6 5...
Страница 18: ...16 General information KGE EN 1711 6 5...
Страница 34: ...32 Maintenance KGE EN 1711 6 5...
Страница 40: ...38 Technical specifications KGE EN 1711 6 5 8 2 Survey curve n 2900 min 1 Figure 14...
Страница 41: ...KGE EN 1711 6 5 Dimensions 39 KGE 9 Dimensions 9 1 KGE Pump with bare shaft end Figure 15...
Страница 56: ...54 ORDFORM 1512 3 3 EN...