15
SECTION 6
RECOMMENDED MAINTENANCE
NOTE:
Any long term shut
-
down requires that all liquid lines, liquid components, pumps, spray guns be
flushed and cleaned thoroughly.
Monthly
Every 6 Months
Every 12 Months
Control Panel
•
Check that all indicator lights work.
•
Check all ribbon cable connections.
•
Check all other cable type
connections.
•
Retighten screw
terminal connections to
insure bonding.
•
Check control relays for
connection.
•
Check calibration of all
controls. See individual
control component
manuals for calibration
procedures.
Pneumatic
Connections
•
Check all pneumatic connections
for leaks and tighten.
•
Check system main air pressure as
specified.
•
Tighten all screw
terminal connections to
insure proper bonding.
•
Check component
calibration. See individual
control component
manuals for calibration
procedures.
Liquid Controls
•
Check all liquid connections,
components, tubes, and hoses for
leaks.
•
Check liquid in
-
line filters and
replace with recommended filter
mesh size for system.
Daily
Monthly
Spray Nozzles
•
Check all spray guns for leaks or
mechanical malfunctions. See
spray gun data sheet for
maintenance and repair details.
•
Clean, lubricate, and
adjust all spray guns.
See spray gun data
sheet for maintenance
and repair details.