DRAFT
66
Spohn & Burkhardt
1. Position the control stand in the installation location, during this process pay attention to the cor-
rect minimum distance to neighboring parts. The rotating and swiveling area of the control stand
must not be blocked.
2. Fasten the control stand in the installation location using 4 screws M10 through the fastening holes
(
30
) in the spacer (
4
) (tightening torque 35 Nm)
4.2. Electrical connection
Attention!
Make sure all cables are laid correctly without kinks or points where they can chafe.
Make sure the cable markers are not removed and mark new cables so they can be iden-
tified. Fasten together the cables using cable ties, if necessary. While laying cables, pay
attention to any bending radii specified by the manufacturer.
Figure 16.
21
21
22
20
22
27, 28
Cable entry
Содержание FS Series
Страница 46: ...DRAFT 46 Spohn Burkhardt 13 Konformitätserklärung ...
Страница 47: ...47 Spohn Burkhardt DRAFT ...
Страница 91: ...91 Spohn Burkhardt DRAFT 13 Declaration of conformity ...
Страница 96: ...DRAFT 4 Spohn Burkhardt 8 2 Heizungs und Lüftungssteuerung demontieren 19 9 Ersatzteile 20 10 Entsorgung 20 ...
Страница 129: ...37 Spohn Burkhardt ...
Страница 130: ...38 Spohn Burkhardt ...
Страница 131: ...39 Spohn Burkhardt ...
Страница 132: ...Spohn Burkhardt GmbH Co KG Mauergasse 5 89143 Blaubeuren Germany Tel 49 7344 171 0 Web www spobu de Mail info spobu de ...