SK1265-AT6
Introduction to the truck
Truck
2-2
SPIERINGS MOBILE CRANES USER MANUAL V 2.9
M
ei
2
0
1
8
Cha
n
g
e
s
a
n
d
t
y
p
o
g
ra
p
h
ic
a
l e
rr
o
rs
r
e
s
e
rv
e
d
.
©
2
0
1
8
S
p
ie
ri
n
g
s
M
o
b
ile
Cr
a
n
e
s
–
A
ll r
ig
h
ts
r
e
s
e
rv
e
d
.
2.2.
Keys
A. Door key;
B. Ignition key truck;
C. Ignition key crane;
D. Key hatch crane cab;
E. General key:
-
Storage boxes truck;
-
Electrical cabinet;
-
Control panel control cabinet;
F. Key fuel tank;
G. Key operated selector switch:
-
Key operated selector switches full / reduced outrigger base;
-
Key operated selector switch emergency control lift on / off;
-
Key operated selector switch emergency control lift up / down;
H. Key engine cowling truck:
-
Left-hand and right-hand cover of engine cowling truck;
I.
Cross key:
-
(Sliding) doors rear toolbox;
-
Removable cover plates engine cowling;
K. Cross key engine cowling crane:
-
Doors engine cowling crane;
L. Cross key control cabinet truck:
-
Control cabinet truck (for the benefit of suspension system and outrigger base).
Picture 2-2