Northrop Grumman Sperry Marine B.V. (Representative Office)
Woltmanstr. 19, D-20097 Hamburg, Germany
Tel.: +49-40-299 00-0, Fax: +49-40-299 00-298, E-mail: [email protected]
005
02
6-
0
1
2
5
-0
0
8
/C
, 30
J
a
n 20
1
8
; P
a
ge
1
o
f 3
NAVIGAT 100
Installation/Overhaul Checklist & Record Sheet
Name of Vessel:
_____________________ Hull No. of Vessel:
_____________________
IMO No. of Vessel:
_____________________ Place of Service:
_____________________
Type of installed Gyrocompass System:
Single:
m
Serial No. of installed
Gyrocompass:
_____________________
Service Company / Name of Service Person:
Date of Service:
Note
After installation/overhaul of the NAVIGAT 100 system please return a
filled-out copy of this checklist to Sperry Marine for inclusion in the ship’s
file under [email protected].
Installation/Overhaul Checklist (mark off all applicable check boxes)
Type of Service performed:
Installation
m
Overhaul
m
Mechanical Installation/Overhaul
The NAVIGAT 100 gyrocompass housing is correctly mounted on a stable, level
foundation.
m
The recommended install distances are kept and sufficient space is provided
around the housing position to open the door and enable service work to be car-
ried out.
m
Adequate ventilation at place of installation is assured.
m
The exact alignment error of the install position is noted for a possible adjustment
of the alignment error correction in the Service Setup 600 later on.
m
Remarks:
Electrical Installation/Overhaul
The main power and back-up power (floating relative to ships ground) supply
present is 24 VDC.
m
All wiring of the NAVIGAT 100 gyrocompass system components is performed
according to standard or project specific connection drawings.
m
All wiring cables are fitted with the applicable cable screens and all cable screens
are correctly connected and secured by clamps.
m
All wiring cables are correctly connected to the corresponding screw-down termi-
nals of the NAVIGAT 100 Mainboard.
m
All the ship's cable are correctly inserted through the inlets of the compass hous-
ing (wires connecting to TB1 – TB4 through left hand side inlets, wires connecting
to TB5 – TB7 through right hand side inlets)
m
Содержание NAVIGAT 100
Страница 38: ...056373 D NAVIGAT 100 1 20 Declaration of Conformity...
Страница 90: ...056373 D NAVIGAT 100 4 4 Gyrosphere Maintenance...
Страница 120: ...056373 D NAVIGAT 100 6 20 Installation Check Procedures...
Страница 176: ...056373 D NAVIGAT 100 9 14 NAVIGAT 100 Software Update...
Страница 190: ...056373 D NAVIGAT 100 XII...
Страница 200: ......
Страница 204: ......
Страница 207: ......
Страница 208: ......
Страница 209: ......
Страница 210: ......
Страница 211: ......