Страница 1: ......
Страница 2: ...lete If freight and or handling damage or shortage of cartons boxes crates should occur it is your responsibility to file a claim with the freight carrier You must note the damaged or shortage on the freight carrier s bill of lading before accepting the shipment It is Spectrum s desire to provide you with superior products and services Unfortunately we cannot control circumstance related to the sh...
Страница 3: ...installation Concrete cutting saw optional retrofit anchor installations Non expanding concrete 3 diameter concrete core drill optional see anchor installation Epoxy or hydraulic cement optional see anchor installation 9 16 wrench 9 16 socket Torque wrench 1 4 hex key Allen wrench Marking pen or chalk Carpenters level ...
Страница 4: ...s and 3 8 flat washers and 3 8 16 Nylock nut from the included hardware package Tighten the 3 8 16 Nylock nut on the shoulder bolt to 15 foot pounds of torque c Attach the hydraulic ram to the lift boom arm between the upper ram attachment tabs as shown in figure 4 Use the 3 8 16 x 1 3 4 long hex head bolt 3 8 lock washer and 3 8 16 hex nut from the included hardware package Tighten the 3 8 16 hex...
Страница 5: ...d Attach the sling to the sling hanger assembly by slipping each end of the sling chain over one of the hanger end hooks Hang the sling hanger assembly from the bottom arm as shown in figure 5 ...
Страница 6: ...ing must be 27 wide 54 long 12 deep Please consult a qualified contractor in your area to determine an appropriate installation b Mark out a 12 x 12 area centered on the anchor location marked in the previous step This will be the concrete to be removed It is recommended that the anchor be located at least 6 from any expansion joint crack drain or similar structure in the concrete Note If your con...
Страница 7: ... and down perpendicular to the deck in all directions It is important that the mast tube is vertically straight so that the lift is not difficult to rotate with weight in the sling seat i Carefully remove the lift from the anchor socket It may be necessary to hold the top of the anchor in place while gently pulling up and turning the mast tube j Allow the concrete to completely cure before re inse...
Страница 8: ...rated by pulling the ram handle away from the ram cylinder to lift the boom arm see figure 8 NOTE It will take approximately 70 pumps of the ram handle to completely extend the hydraulic ram and reach the fully raised lift position b Push the handle toward the ram cylinder to lower the boom arm c Rotate the lift by pushing or pulling the boom arm or sling in either direction The Elkhorn can rotate...
Страница 9: ...ormation on maintenance Maintenance Point 1 Make sure the bolt nut assembly is securely tightened and not worn or damaged Maintenance Point 2 Make sure the bolt nut assembly is securely tightened and not worn or damaged Maintenance Point 3 Make sure the 1 2 shoulder bolt in the end of the hydraulic ram is tightened to 25 foot pounds of torque Make sure the 1 2 shoulder bolt through the clevis and ...
Страница 10: ...uently with fresh water not pool water and wipe clean with a dry cloth b Inspect your equipment for any discoloration or water stains on the stainless steel surface If this condition exists clean the affected area with a 3M scratch pad and non chlorinated stainless steel cleaner Spectrum Cleaning Kit No 202050 00 Rinse off the affected area with clean water and dry with a clean cloth WARNING DO NO...
Страница 11: ...53 11 Lock Washer 3 8 1 20017 12 Hex Nut 3 8 16 1 20004 13 1 2 Shoulder 1 1 4 x3 8 16 1 566335 03 14 Plastic Washer 3 566690 03 15 Flat Washer 3 8 1 20012 16 Nylock Nut 3 8 16 1 20011 17 1 2 Shoulder 1 1 4 x3 8 16 1 566330 03 18 Ram Clevis 1 513807 03 19 HDPE Tube Cap 1 9x 145 1 522525 03 Chain Kit 209258 00 20 Chain Stainless Steel 3 16 6 557610 03 21 Quick Link 3 16 6 13035 Stickers 23 Elkhorn D...