Spectroline CC-80 Скачать руководство пользователя страница 1

OPERATING INSTRUCTIONS

 

CC-80 and CC-81  

Fluorescence Analysis Cabinets

 

Manual No. AM11028

Printed in U.S.A. 

Issued: September 2011

CC-81

Содержание CC-80

Страница 1: ...OPERATING INSTRUCTIONS CC 80 and CC 81 Fluorescence Analysis Cabinets Manual No AM11028 Printed in U S A Issued September 2011 CC 81 ...

Страница 2: ...ntrast with transillumination these units may be placed over a wide range of Spectroline UV transilluminators CABINET DESCRIPTION 1 Eyepiece Flexible eyepiece with UV absorbing viewing Viewing Assembly window to protect the eyes and increase contrast 2 Photographic Port Used when photographing samples To expose remove the viewing assembly 3 Master Power Controls power supply to the cabinet Switch ...

Страница 3: ...he equipment 3 Check the lamp s electrical performance as soon as possible according to the GENERAL FUNCTIONAL CHECKS outlined in the OPERATION section of this manual OPERATION GENERAL FUNCTIONAL CHECKS 1 Connect the cabinet plug to a power outlet that complies with the electrical requirements specified on the unit s label 2 Depress the master switch to the ON position This switch must be activate...

Страница 4: ...EL A black bottom panel is enclosed with the cabinet When using the cabinet without a transilluminator the panel should be in place to ensure proper shielding from ambient light Remove the four round rubber screw holders with a Phillips screwdriver Align the four openings in the panel with the bottom of the cabinet and reattach the rubber screw holders USING WITH A TRANSILLUMINATOR Place the Spect...

Страница 5: ... WINDOW MAINTENANCE Immediately clean all spills from the housing using water and a mild detergent if necessary and wipe dry Take care not to allow any liquids to leak into electrical components Periodically clean the UV absorbing viewing window with a glass cleaner and soft cloth ENVIRONMENTAL SPECIFICATIONS The CC 80 and CC 81 cabinets are designed to be safe under the following conditions Indoo...

Страница 6: ...other service work is required a quote will be furnished upon evaluation of the unit Service work will not be performed without customer approval SHIPPING Carefully pack the equipment in the original shipping container and packing materials Insure it for full value and ship it prepaid to the factory 6 MODEL DESCRIPTION TUBES FILTER VOLTAGE REQUIRED CC 80 Cabinet 120V 60Hz 2 0A CC 80 F Cabinet Euro...

Страница 7: ...TS Description Product No Bulb 25W White Light BLE 1T261 Eyepiece UV Absorbing Window Assembly LAMP CONTAINS MERCURY Manage in Accord with Disposal Laws See www lamprecycle org Caution refer to accompanying documents ...

Отзывы: