Clearances

Before

 

moving

 

the

 

library

 

and

 

components

 

to

 

where

 

they

 

will

 

be

 

installed,

 

make

 

sure

 

that

 

you

 

have

 

access

 

to

 

necessary

 

doorways,

 

stairways,

 

hallways,

 

and

 

elevators,

 

as

 

well

 

as

 

adequate

 

clearance

 

to

 

move

 

through

 

them

 

with

 

the

 

equipment.

Note:

All

 

lengths

 

are

 

approximate.

Tilting

Make

 

sure

 

that

 

you

 

do

 

not

 

tilt

 

the

 

frames

 

from

 

vertical

 

while

 

moving

 

them.

 

Clearance for...

Requirement

Unpacking

Sufficient

 

space

 

to

 

both

 

remove

 

the

 

library

 

from

 

its

 

packaging

 

and

 

unpack

 

the

 

boxes

 

containing

 

the

 

additional

 

components.

Allow

 

a

 

minimum

 

of

 

approximately

 

17

 

ft

 

(5.2

 

m)

 

on

 

the

 

ramp

 

side

 

of

 

the

 

pallet

 

to

 

unload

 

the

 

library

 

and

 

approximately

 

4

 

ft

 

(1.2

 

m)

 

on

 

each

 

side

 

and

 

above

 

the

 

crate

 

to

 

remove

 

the

 

packaging.

 

Allow

 

a

 

minimum

 

of

 

12

 

ft

 

by

 

12

 

ft

 

(3.7

 

m

 

by

 

3.7

 

m)

 

of

 

open

 

space

 

for

 

maneuvering

 

the

 

individual

 

frames

 

from

 

their

 

crates.

Doorways

Doorways

 

(including

 

thresholds)

 

must

 

be

 

taller

 

than

 

6.7

 

ft

 

(2

 

m)

 

and

 

wider

 

than

 

4

 

ft

 

(1.2

 

m).

Stairwell

 

width

 

and

 

height

Stairwells

 

must

 

be

 

taller

 

than

 

7.5

 

ft

 

(2.3

 

m)

 

and

 

wider

 

than

 

4

 

ft

 

(1.2 m).

Stairwell

 

and

 

hallway

 

corners

Stairwell

 

and

 

hallway

 

corners

 

should

 

be

 

wider

 

than

 

5.6

 

ft

 

(1.7

 

m).

Elevator

 

width,

 

height,

 

and

 

weight

 

limit

Elevators

 

and

 

elevator

 

doors

 

should

 

be

 

taller

 

than

 

7.5

 

ft

 

(2.3

 

m)

 

and

 

wider

 

than

 

4

 

ft

 

(1.2

 

m).

 

If

 

using

 

an

 

elevator

 

to

 

move

 

the

 

crates,

 

it

 

must

 

be

 

able

 

to

 

accommodate

 

the

 

size

 

and

 

weight

 

of

 

the

 

crates.

 

See

 

Receiving

 

and

 

Storing

 

the

 

Library

 

on

 

page 32

 

for

 

details.

 Side-to-side clearance

11 ft (3.4 m)

17 ft (5.2 m)

Minimum ramp clearance

Pallet

Ramp

Frame

Caution

If you tilt the library, Spectra Logic is not responsible for any damage caused to the 
library or its components, or for any damage caused to your site.

Содержание T950B

Страница 1: ...SpectraLogic com Spectra T950B Library Site Preparation Guide...

Страница 2: ...y revise this publication from time to time without notice and reserves the right to change any product specification at any time without notice Trademarks BlueScale CC Spectra SpectraGuard Spectra Lo...

Страница 3: ...ect life support machines or weapons systems in which the failure of Java technology could lead directly to death personal injury or severe physical or environmental damage No Liability for Certain Da...

Страница 4: ...when moving these and ensure that your floor has adequate structural integrity WARNING Line voltage exists at these connectors Only qualified personnel should attempt to conduct this test Use extreme...

Страница 5: ...hnical Support Technical Support Portal support spectralogic com United States and Canada Phone Toll free US and Canada 1 800 227 4637 International 1 303 449 0160 Europe Middle East Africa Phone 44 0...

Страница 6: ...Requirements 16 PHYSICAL REQUIREMENTS 16 Data Center Flooring 16 Space Requirements 18 Power Requirements 22 NETWORK CABLING REQUIREMENTS 27 ENVIRONMENTAL REQUIREMENTS 29 Chapter 3 Preparing for Inst...

Страница 7: ...ring a site for a T950 library installation It provides reference information for facility managers electricians IT professionals and other specialists who will have roles in preparing the site RELATE...

Страница 8: ...in the library The Spectra Tape Libraries XML Command Reference provides detailed information about using the XML interface with the T950 library The Spectra Tape Libraries Warnings document provides...

Страница 9: ...Center Tivoli Key Lifecycle Manager Installation and Configuration Guide Typographical Conventions This document uses the following conventions to highlight important information Note Read text marke...

Страница 10: ...t be included in your library For detailed descriptions of the library components and media read the Library Overview chapter in the Spectra T950 Library User Guide for your library The library will b...

Страница 11: ...expansion frames T950B main frames have a centered center TAP and operator panel T950 main frames have an offset center TeraPack Access Port TAP and operator panel T950B media expansion frames do not...

Страница 12: ...te Preparation Guide Spectra T950B Library 12 Figure 2 T950 library with optional bulk TAP expansion frame Center Air filter and fans TAP Drive and media expansion frames Operator panel Window Main fr...

Страница 13: ...tion through the library Figure 3 Library rear components main frame doors removed Drive Bay Assembly DBA Media storage chambers Drives TeraPack Bay Assembly TBA behind cover panel Robotics power supp...

Страница 14: ...t include any active front or rear panel components LIBRARY CAPACITY The T950 s modular design makes it possible to increase media capacity or the number of drives in the library to meet storage and p...

Страница 15: ...TBAs or shelves 98 980 12 6 DBAs 80 800 24 Drive expansion optional 3 DBAs 3 TBAs 101 1010 12 3 DBAs shelves 107 1070 12 6 DBAs 89 890 24 Media expansion optional 130 1300 None Bulk TAP expansion opti...

Страница 16: ...nces for maintenance access to and expansion of the library Data Center Flooring The flooring where you plan to install the library is an important part of the installation and operation planning Make...

Страница 17: ...cm Weight d T950 6D0T 954 lb 433 kg 3D3T 933 lb 423 kg T950B 6D0T 895 lb 406 kg 3D3T 876 lb 397 kg 6D0T 720 lb 327 kg 3D3T 750 lb 340 kg T950 547 lb 248 kg T950B 538 lb 244 kg 800 lb 363 kg Each tape...

Страница 18: ...ting This requirement is particularly important when installing a multi frame library because all frames must be precisely aligned Carpeting also increases the risk of static discharge when operating...

Страница 19: ...eptable In addition a minimum of 2 ft 0 6 m of clearance at the front and back of the main frame each drive expansion frame and the bulk TAP frame is required for airflow and for service and operator...

Страница 20: ...t frame T950 including recommended service access clearance 9 6 ft 3 0 m Total depth with clearance Frame depth 3 6 ft 1 1 m 25 5 ft 7 8 m Total width with clearance Main Frame 8 Frame library width 1...

Страница 21: ...floor before cutting holes in the floor for access WARNING Library frames are very heavy see product specifications for details Use extreme caution and proper equipment when moving these and ensure th...

Страница 22: ...hing between two AC power sources in a redundant AC power configuration the two AC inputs for each frame must be on the same phase Different frames can be on different phases Also the voltages of the...

Страница 23: ...than 4 V The voltage from A to B or B to A should be between 200 and 240 V The voltage between any A or B pin to either C pin should be about 120 V Each library frame is rated at 200 240 VAC at 13 amp...

Страница 24: ...screw lug to the building s earth ground Power Cord Specifications The power cords included with the library are considered part of the library and are not intended for use with any other equipment Th...

Страница 25: ...cles The power receptacles for the main frame and the drive expansion frames are located in the lower right hand corner of the frame as you face the back of the library see Figure 3 on page 13 The fol...

Страница 26: ...ghter the load on the power supplies the less efficient they are The power supply efficiency in turn affects the power draw of all components Component Power Consumption watts Heat Load Continuous BTU...

Страница 27: ...al information Use Figure 11 and the descriptions that follow to plan network connectivity for the library installation Figure 11 Locations for network cable connections Library Control Module LCM Fib...

Страница 28: ...cation 62 5 micron 400 M6 SN I classification Tape Drive Access Provide one optical fiber cable from the arbitrated loop or switched fabric to a Fibre Channel port on each drive to provide the hosts w...

Страница 29: ...following tables outlines the necessary data center and storage area specifications Operating Environmental Specification Humidity 20 to 80 non condensing Humidity gradient Less than 10 per hour Ambi...

Страница 30: ...age shock levels indicate how much shock the library can withstand when it is not operating After experiencing this amount of shock the library will operate normally Figure 12 Location of the fire ext...

Страница 31: ...the Library page 32 Unpacking and Moving the Library page 33 Moving the Library After Installation page 35 WARNING Library frames are very heavy see product specifications for details Use extreme caut...

Страница 32: ...0 6 m 200 lb 91 kg Crated HAX Rail c 2 frame 3 frame 5 frame 6 frame 8 frame d 6 1 ft 1 9 m 7 7 ft 2 3 m 12 5 ft 3 8 m 15 0 ft 4 6 m 7 3 ft 2 2 m 2 3 ft 0 7 m 3 0 ft 0 9 m 1 8 ft 0 5 m 1 8 ft 0 5 m 2...

Страница 33: ...ibrary on page 32 Required Equipment Ensure that any equipment used to move the library components can transport the weights shown in Receiving and Storing the Library on page 32 Level Surfaces A pall...

Страница 34: ...bove the crate to remove the packaging Allow a minimum of 12 ft by 12 ft 3 7 m by 3 7 m of open space for maneuvering the individual frames from their crates Doorways Doorways including thresholds mus...

Страница 35: ...dust filtering After the library is installed do not move the library Contact Spectra Logic Technical Support before making any changes to your library hardware or performing any service operations Im...

Страница 36: ...rary s cable access areas Power Requirements on page 22 Electrical and peripheral equipment cabling is complete and organized Proper number and type of outlets are available at the required locations...

Страница 37: ...e allows 24 hours for the library to acclimate before installation Unpacking and Moving the Library on page 33 Floors to be traversed can handle the weight of the crated frames Transportation equipmen...

Отзывы: