Spectra nTier Verde Array Скачать руководство пользователя страница 3

October 2013

Boot Drive Replacement

Spectra nTier Verde Array

3

Contacting Spectra Logic

To Obtain General Information

Spectra Logic Website:

 www.spectralogic.com

 

United States Headquarters

European Office

Spectra

 

Logic

 

Corporation

6285

 

Lookout

 

Road

Boulder,

 

CO

 

80301

USA

Phone:

1.800.833.1132

 

or

 

1.303.449.6400

International:

1.303.449.6400

Fax:

1.303.939.8844

Spectra

 

Logic

 

Europe

 

Ltd.

Venture

 

House

Arlington

 

Square,

 

Downshire

 

Way

Bracknell,

 

RG12

 

1WA

United

 

Kingdom

Phone:

44

 

(0)

 

870.112.2150

Fax:

44

 

(0)

 

870.112.2175

Spectra Logic Technical Support

Technical Support Portal:

support.spectralogic.com 

United States and Canada

Phone:

Toll

 

free

 

US

 

and

 

Canada:

1.800.227.4637

International:

1.303.449.0160

Email:

[email protected]

Europe, Middle East, Africa

Phone:

44

 

(0)

 

870.112.2185

Email:

[email protected]

Deutsch sprechende Kunden

Phone:

49

 

(0)

 

6028.9796.507

Email:

[email protected]

Mexico, Central and South America, Asia, Australia, and New Zealand

Phone:

 

1.303.449.0160

Email:

 

[email protected]

Spectra Logic Sales

Website: 

www.spectralogic.com/shop 

United States and Canada

Phone:

1.800.833.1132

 

or

 

1.303.449.6400

Fax:

1.303.939.8844

Email:

[email protected]

Europe

Phone:

44

 

(0)

 

870.112.2150

Fax:

44

 

(0)

 

870.112.2175

Email:

[email protected]

To Obtain Documentation

Spectra Logic Website: 

www.spectralogic.com/documents

 

Содержание nTier Verde Array

Страница 1: ...SpectraLogic com Spectra nTier Verde Array Boot Drive Replacement...

Страница 2: ...d of the possibility of such damages arising from any defect or error Information furnished in this manual is believed to be accurate and reliable However no responsibility is assumed by Spectra Logic...

Страница 3: ...support spectralogic com United States and Canada Phone Toll free US and Canada 1 800 227 4637 International 1 303 449 0160 Email support spectralogic com Europe Middle East Africa Phone 44 0 870 112...

Страница 4: ...ovide storage for the operating system and StrataView web interface The procedure is different for each size of master node Use the instructions in one of the following sections Replace a Boot Drive i...

Страница 5: ...rde 4U master node Estimated Time 30 minutes Before you Begin Before replacing a boot drive make sure that you have addressed the requirements in this section Gather Materials and Tools Required A gro...

Страница 6: ...i static bags Connect the wristband to the static protection mat or to other suitable ESD grounding Note Keep all electronic components in anti static bags when not in use Discontinue Storage Operatio...

Страница 7: ...the Power screen click Shutdown 3 A confirmation screen displays Confirm the selection to shutdown the nTier Verde array 4 Once the array finishes powering off disconnect the power cords from the pow...

Страница 8: ...the array Remove the Array From a Rack Use these instructions to remove the array from a rack 1 Using a 2 Phillips screwdriver remove the screw on each side of the front of the array Warning The Spect...

Страница 9: ...lly extended and the self locking latches engage on each rack rail 3 While supporting the front of the chassis with one hand press and hold the self locking latches on both inner rails downward While...

Страница 10: ...Any damage to the Spectra nTier Verde caused by failure to protect it from electrostatic discharge ESD voids the Spectra nTier Verde warranty To protect the Spectra nTier Verde drives from damage Wear...

Страница 11: ...closest to the chassis wall Note To remove boot drive 2 you must first remove boot drive 1 4 Locate the clip securing the boot drive to the motherboard Figure 10 shows the clip holding the drive You w...

Страница 12: ...from the failed module 9 Set the failed module aside for return to Spectra Logic see Returns on page 22 10 Connect the power cable to the replacement module The connector is keyed to only fit one way...

Страница 13: ...to reinstall the array in a rack 1 Pull the center section of the outer rails out of the rack until they are fully extended see Figure 13 on page 14 Figure 12 Orient the cover with the tabs facing to...

Страница 14: ...ack 3 Slide the chassis into the rack until the self locking latches engage 4 While supporting the front of the chassis with one hand press the self locking latches on both inner rails downward Push t...

Страница 15: ...es that you disconnected before removing the array from the rack 7 Power on the nTier Verde array by pressing the power button on the front panel The power LED illuminates indicating that power is on...

Страница 16: ...ive in the nTier Verde 2U master node Estimated Time 15 minutes Before You Begin Before replacing a boot drive make sure that you have addressed the requirements in this section Gather Materials and T...

Страница 17: ...c protection mat or to other suitable ESD grounding Note Keep all electronic components in anti static bags when not in use Discontinue Storage Operations Although the boot drives in the nTier Verde 2...

Страница 18: ...ed 2 Locate the boot drive you want to replace Drive 1 is on the left and drive 2 is on the right Caution Any damage to the Spectra nTier Verde caused by failure to protect it from electrostatic disch...

Страница 19: ...ately 20 seconds to allow the drive platters to stop spinning Then slide the drive completely out of the array This delay avoids causing additional damage that might interfere with failure analysis 5...

Страница 20: ...following instructions to reboot the array a From any screen of the StrataView interface click the Power icon in the lower right hand corner The Power screen displays b Click Reboot A confirmation scr...

Страница 21: ...us a check mark in a green circle If a boot drive does not indicate a good status contact Spectra Logic Technical Support see Contacting Spectra Logic on page 3 nTier Verde 2U master node Confirm the...

Страница 22: ...LL of the packaging material shipped with the replacement component including any anti static bags or foam inserts Use the return label and instructions that were included with the replacement compone...

Отзывы: