background image

 

 

Quick Start Guide For Quest ATR 

Accessory P/N GS10800 Series  

 

 

 

This Quick Start Guide is intended to help you through the steps required for the correct first time installation and 
alignment of the 

Quest ATR Accessory 

into your IR spectrometer system. This guide is a supplement to the 

Instruction Manual provided for the accessory itself where more detailed information can be found. 
 
 

Step 1 – Install the Benchmark™ Baseplate into your spectrometer 

 
The Benchmark™ baseplate supplied allows the Quest ATR Accessory to be 
positioned correctly in the sample compartment of your specific spectrometer. 
Please consult the relevant page of the Benchmark™ Baseplate Installation Guide 
instruction manual (2I-549-000-7) if you need more information. 
 
 
 

Step 2 – Fit the Quest ATR Accessory (Optical Unit) to the Baseplate 

 
The Quest ATR Accessory can now be fitted onto the baseplate.  
The Optical Unit is placed over the baseplate support pillars and  
the central front Fixing Thumbscrew tightened into the central pillar.  
 
 
 
 
 
 
 
 
 
 
 

Step 3 – Fit the ATR Crystal Puck to the Optical Unit 

 
The Quest ATR accessory is normally supplied with the ATR Crystal Puck already in place 
on the Optical Unit. Release the pressure tower and remove any packing material on the 
diamond. 
 

 
 
        

           
 
 
 
 

          Top View of Crystal Puck                        Underside View of Crystal Puck 
 

If the puck has not already been fitted, then place it on the optical unit as shown. Take 
care that the 

Notch

 on the underside of the Crystal Puck locates with the small pin on the 

top and to the front of the Optical Unit. The Crystal Puck is held in position by three magnet 
catches around the top aperture of the Optical Unit.  

 
 
 

Notch 

Fixing 

Thumbscrew 

Отзывы: