Speakman SC-1220 SERIES Скачать руководство пользователя страница 1

INSTRUCTIONS FOR MODELS

92-SC-12XX-01

For additional assistance or service please contact:

SPEAKMAN

®

 Company

400 Anchor Mill Road
New Castle, DE 19720

800-537-2107

[email protected]

www.speakman.com

SC-1210 SERIES

SC-1220 SERIES

SC-1230 SERIES

SC-1240 SERIES

HELPFUL TOOLS & SUPPLIES:

Pencil

TOOLS AND SUPPLIES

Thread Seal

Tape

Pipe

Wrench

Drill

Drill Bit

3/16”

Mounting Hardware

(Included)

Adjustable

Wrench

Phillips

Screwdriver

Warranty information can be found at: 
www.speakman.com

WARRANTY

MAINTENANCE

Cover your drain to prevent loss of parts. Be sure to 
wear eye protection while cutting pipe.

SAFETY TIPS

FREEZE PROTECTION

Freeze damage to the shower unit will void the 

Freeze damage to the shower unit will void the 
warranty. It is important to winterize the complete 

warranty. It is important to winterize the complete 
shower unit. The unit must be drained of all water 

shower unit. The unit must be drained of all water 
in freezing conditions. This includes removing the 

in freezing conditions. This includes removing the 
valve cartridge and the shower head from the unit. 

valve cartridge and the shower head from the unit. 
Store the valve cartridge and shower head indoors.

Store the valve cartridge and shower head indoors.

• Mounting location must be capable of supporting 
the product in use.

The shower valves are washerless and require no routine 
maintenance. The gleaming finish of your SPEAKMAN 
Commander shower can be cleaned by using mild soap 
and warm water. Dry immediately with a soft, clean 
cloth for best results. To remove the index button on the 
vandal resistant handles, locate knockout hole on handle 
underneath one of the arms of the handle. Insert a rigid 
pin (1/8” diameter or smaller) into hole and knockout 
index button.

Your new Speakman Product is designed for years of 
trouble-free performance. Keep it looking new by 
cleaning it periodically with a soft cloth. The use of harsh 
chemicals and abrasives on any of the Speakman custom 
finish products may damage the finish and void the 
product warranty.  Please be sure to only use approved 
cleaners.  Please contact Speakman for any clarification 
of acceptable cleaners.

CAUTION:

 When outdoor temperature

rises above 90 degrees, use caution to
prevent scalding from water stored within
the unit. It is recommended to flush the unit
by turning it on for 30 seconds before
entering the shower water. This will avoid
accidental scalding by the user and ensure
safe use of the shower unit.

IMPORTANT

• Be sure to read instructions thoroughly before 
beginning installation.

• Do not over-tighten any connections or damage 
may occur.

• This shower valve has an operating range of 
20-80 psi.

NOTE:

 Shut off water supplies. Supplies

must be on 6” centers. Recommended

height from center of valve body to floor

is 54”. Valve body is reversible to take

supplies from below. 

1

Slide the Strap (1) onto the Shower Arm. Then 
apply sealant to inlet threads of Shower Arm 
and the Plug (3). Screw the Shower Arm into the 
Valve Body (2). Tighten and position outlet 
perpendicular with Valve Body. Use Adjustable 
Wrench to tighten the Plug (3) into the Valve 
Body (2).

2

Following the rough-in dimensions for your model (located ot the end of this manual), install Supply Pipes at 
proper location. See images below for reference.

FITTING WITH WALL FLANGE:

Apply pipe sealant to one end of Supply Pipes 
(provided). Screw pipes into supply lines.

NOTE- Supply lines must have 1/2 NPT female 
threaded ends and be 

1-1/8”

 from center of 

supply line to finished wall.

FITTING WITH LUGS:

Supply lines must have 1/2 NPT male threaded 
ends and be 

7/8”

 from center of supply line to 

finished wall.

  18 12 "

470mm

 

 

5 12 "

143mm

 

4'-6'

137 Meters

TO FLOOR

  8 7

16 "

215mm

 

  6 3

16 "

157mm

 

SUPPLY LINE

FINISHED
WALL
SURFACE

1¹⁄

8

MOUNTING DEPTH

FITTING WITH WALL FLANGE

4"-6"

[1.37 Meters]

TO FLOOR

 

18 12 "

470mm

 

 

5 12 "

143mm

 

 

7 14 "

193mm

 

FINISHED
WALL
SURFACE

7

8

MOUNTING DEPTH

FITTING WITH LUGS

3

Apply sealant to threads of Supply Lines (1). Slip 
Coupling Nuts (2) onto Supply Lines and screw 
Swivels (3) up hand tight. Gripping on small 
diameter of Swivels with a Pipe Wrench, tighten 
pipes and/or Swivels.

Отзывы: