Speakman CPV-PB-PXC Скачать руководство пользователя страница 1

INSTRUCTIONS FOR MODELS

92-CPV-PB-PXC-01

For additional assistance or service please contact:

SPEAKMAN

®

 Company

400 Anchor Mill Road
New Castle, DE 19720

800-537-2107

[email protected]

www.speakman.com

CPV-PB-PXC
CPV-PB-DV-PXC

HELPFUL TOOLS & SUPPLIES:

NOTE: PEX tools and supplies NOT INCLUDED.

TOOLS AND SUPPLIES

Drill

Pencil

Keyhole

Saw

Adjustable

Wrench

Thread Seal

Tape

9/16” (14mm)

Deep Well Socket

Socket

Wrench

Pipe

Wrench

Crimp

Ring

PEX

Go/No-Go

Gauge

NO GO

GO

NO GO

GO

PEX Crimp

Tool

PEX

Cutter

Solder Kit

Phillips

Screwdriver

Measuring

Tape

Safety

Glasses

Tubing

Cutter

Level

Slip Joint

Wrench

13/16” (20mm)

Deep Well Socket

Warranty information can be found at: 
www.speakman.com

WARRANTY

Your new Shower/Bath Valve is designed for years of 
trouble-free performance. Keep it looking new by 
cleaning it periodically with a soft cloth. The use of 
harsh chemicals and abrasives on any of the Speakman 
custom finish products may damage the finish and void 
the product warranty. Please be sure to only use 
approved cleaners. Please contact Speakman for any 
clarification of acceptable cleaners.

MAINTENANCE

Cover your drain to prevent loss of parts. Be sure to 
wear eye protection while cutting pipe.

SAFETY TIPS

IMPORTANT

• Be sure to read instructions thoroughly before  
   beginning installation.

• Be sure to have properly adjusted the Temperature  
   Limiting Stop (TLS) as outlined in this Installation  
   Manual.

• Inspect all connections after installation of valve.

• This valve has an operating range of 20-80 psi.

• This valve is designed to be used in conjunction  
   with a shower-head rated at 1.75 gpm (6.6 L/min)  
   or higher flow rate.

• 

NOTE:

 This installation manual covers several  

   models of valves. While the appearance of your  
   valve may differ from those shown, the installation  
   method is the same.

• Maximum water pressure: 125 psi static; minimum  
   water pressure: 20 psi flowing; minimum cold     
   supply temperature: 40 °F; maximum hot supply  
   temperature: 160 °F; minimum hot supply    
   temperature: 5 °F above set point.

This type of valve must be cleaned and maintained on a 
regular basis. Periodic maintenance should be 
performed at least every 12 months or after any 
changes have been made to the building’s plumbing 
system. This maintenance should include removing and 
cleaning the spring check stop components. Make sure 
the stop poppet in each stop moves freely. Valves that 
are installed outdoors should be winterized by removing 
all of the internal parts and removing any standing 
water from the valve. Quarterly the maximum hot 
temperature setting (TLS) should be checked and 
adjusted accordingly. 

1

Remove the two Screws with a Philips Head 
Screwdriver then slide the Rough-In Template off 
the Valve. 

2

Referencing the supplied rough-in dimensions
(located at the end of this manual), determine the 
preferred location of Valve. Align the supplied 
Rough-In Template with this location and trace 
outline of Template onto wall. Using a Keyhole 
Saw or similar tool, cut along traced line and 
remove this section of wall.

3

Shut off the water supply to the Tub and Shower. Verify that the hole sizes and
positions in the wall are correct:

A

. The shower and tub spout outlet holes should be 1” diameter.

B

. To determine the Valve mounting depth, see 

STEP 4

.

C

. The distance from the Valve mounting surface to the finished wall MUST be 

between 3-1/8" to 4-1/8". Position the Valve Body 

 correctly in the wall with 

the “UP” pointing up. The 1’-9” minimum from the Valve Body to the Tub Spout is 
required for proper operation.

4’-6” (1.4 meters)

Shower Only

1’-9”

(533mm)

Tub/Shower

6’-6” (1.4 meters)

Tub/Shower

&

Shower Only

Ø1” Hole for Shower Arm

Ø1” Hole for Tub Spout

ØSee Step 4

4”

(102mm)

Tub/Shower

4

Install the Rough-In Template over the Shower Valve being sure the Rough-In Template sits flush against Valve Body. Following
the rough-in dimensions for your model of valve (located ot the end of this manual) as well as the markings on the supplied
Rough-In Template, install valve at proper depth. The distance from the Valve mounting surface to the finished wall MUST be 
between 

3-1/8" - 4-1/8"

. See images below for reference.

SHOWER OUTLET

TUB OUTLET

ROUGH-IN TEMPLATE

THE BACK SURFACE OF THE 
ROUGH-IN TEMPLATE IS 
FLUSH WITH OR INSIDE 
THE VALVE ACCESS HOLE.

FINISHED WALL SURFACE

3-1/8” MINIMUM

MOUNTING DEPTH

1" X 4"
DIMENSIONAL
LUMBER

MINIMUM MOUNTING DEPTH

SHOWER OUTLET

TUB OUTLET

ROUGH-IN TEMPLATE

THE FRONT EDGE OF THE 
ROUGH-IN TEMPLATE IS 
FLUSH WITH OR OUTSIDE 
THE VALVE ACCESS HOLE.

FINISHED WALL SURFACE

4-1/8” MAXIMUM

MOUNTING DEPTH

1" X 4"
DIMENSIONAL
LUMBER

MAXIMUM MOUNTING DEPTH

5

Mounting Structure behind the wall must 
be capable of supporting the Valve in 
use. Following the rough-in dimensions 
for your model of valve (located ot the 
end of this manual), reference the 
diagram below for the installation and 
placement of the bracing within a 2"x4" 
wall, using a 1"x4" brace. Mounting 
hardware is not included.

 

 

4 12 "

114mm

 

  14 12 "

368mm

 

Отзывы: