C
D
52
16
B
10
1
2
3
3
C
x16
A
5x5
A
C
5
1
2
A
C
6
6
1
2
E
8
1
A
2
12
D
1
A
4x4
Model: SPE-403H
Installation guide
125KG
600-1230mm
1100-1800mm
3
38
m m/s
0
-4 0
°
C
C E FCC C U L
100
-
240
V
Technical data
Max. Weight
Capacity
Column Stage
Height Range
Width Range
Duty Cycle
Input Voltage
Max Speed
Temperature
Certification
10%, Max. 2 min on/ Min. 18 min off
Accessory list
Attention: The drawings below are only for reference which might be slightly
different from the actual object, please in kind prevail. Any tools missing or
installation problems,please contact the customer service firstly.
No.
Image
Spec
Qty
ST4.2x16mm
M6X16mm
ST4.8x16mm
Allen Key
4x4mm
Allen Key
5x5mm
M8X35mm
Component list
7
4
8
2
3
2
4
4
1
2
2
2
5
2
6
4
9
2
10
2
11
4
12
12
No.
Part
Qty No.
Part
Qty
No.
Part
Qty No.
Part
Qty
No.
Part
Qty No.
Part
Qty
No.
Part
Qty No.
Part
Qty
No.
Part
Qty No.
Part
Qty
No.
Part
Qty No.
Part
Qty
Control Box
Left Lifting
Column
Right Lifting
Column
Connecting Beam
Side Bracket
Cover
Supporting Beam
Cable Management Tray
Hand Switch
Power Plug
Adhesive Pad
Panel Fixed Base
STEP 1
Install the connecting
beam(3)
STEP 2
Install the supporting beam(5) use 5*5
wrench(A) to tighten the screws(C).
Install the side bracket(6), and use
5*5 wrench(A) to tighten the screws(C).
STEP 3
Install the tabletop
Loosen
Pull
Tighten
Tabletop
Attach the adhesive pad
Install connecting beam (3), and tighten
it with spline end wrench (14).
Tighten the screw (13)
with spline end
wrench (14).
D
x44
13
8
14
1
No.
Part
Qty No.
Part
Qty
Spline End Wrench
M8
1
10
2
2
3
5
6
7
8
9
11
11
12
10
4
13
14
x8
14
13