1
3
8
A
C
D
4
B
E
8
F
6
6
1
3
2
7
1
8
1
1
2
2
2
5
1
16
8
2
9
1
10
1
10
9
12
B
x8
A
x4
G
4x4
G
4x4
G
B
2
G
A
6
4
6
7
C
x8
G
4x4
G
C
2
1
11
4
2
2
2
12
4
5
5
5
4
11
G
1
6
5
3
4
Item No.:
SPE-226A
Installation guide
Accessory list
Attention: The drawings below are for guidance only and they may differ
slightly from the product and fittings received. Please contact our customer
service department if you have any queries.
No.
Image
Spec
Qty
100KG
645-1300mm(With tabletop)
1100-1700mm
3
Column Stage
Technical data
Max. Weight Capacity
Height Range
Width Range
M6
M6
M6
St4
.
2
Allen Key
4x4mm
St4
.
2
Cable tie
Component list
No.
Part
Qty No.
Part
Qty
No.
Part
Qty No.
Part
Qty
No.
Part
Qty No.
Part
Qty
No.
Part
Qty No.
Part
Qty
No.
Part
Qty No.
Part
Qty
No.
Part
Qty No.
Part
Qty
Feet
Lifting Column
Connection rod
Left
Supporting Beam
Right
Supporting Beam
Side bracket
Adapter arm
Adapter
Control Box
Handset
(Option)
Power Plug
Adapter cable
STEP 1
Install the supporting beam and the side bracket
Tighten it
Using screws (A) to connect the connection rod (3) with the left
supporting beam (4) and the right supporting beam (5), and
tighten them with the allen key (G).
Using screws (A) to connect the side bracket (6) with the left
supporting beam (4) and the right supporting beam (5), and
tighten them with the allen key (G).
STEP 2
STEP 3
Install the lifting column
Using screws (B) to connect the lifting column (2) with the left
supporting beam (4) and the right supporting beam (5), and
tighten them with the allen key (G).
Install the feet
Connect the feet(1) and the lifting column (2) with screws (C),
and tighten them with the allen key (G).
If the connecting rod cannot be inserted
into the supporting beam, please loosen
the screws on the beam.