INSTRUCTION, USE AND
MAINTENANCE MANUAL
Page 12 of 45
GB
The machine must be fixed on a flat floor surface,
preferably of cement or tiled. Avoid yielding or irregu-
lar surfaces.
The base floor must be able to support the loads
transmitted during operation. This surface must have
a capacity load of at least 500 kg/m².
The depth of the solid floor must be sufficient to guar-
antee that the anchoring bolts hold.
8.3
Lighting
The machine does not require its own lighting for
normal working operations.
However, it must be placed in an adequately lit envi-
ronment.
For correct lighting, use lamps having total power
800/1200 Watt as envisaged by UNI 10380.
9.0 ANCHORING SYSTEM
The packed machine is fixed to the support pallet
through the holes prearranged on the frame. Such
holes can be used also to fix the machine to the ground,
through floor anchor small blocks (excluded from sup-
ply). Before carrying out the definitive fixing, check that
all the anchor points are laid down flat and correctly
in contact with the fixing surface itself. If not so, insert
shimming profiles between the machine and the fixing
lower surface, as indicated in
Fig. 5
.
Fig. 5
a
= 762
b
= 410
c
= 525
• Execute 4 holes with 10 mm diameter on the floor
by the holes on the bottom floor;
• insert the small blocks (excluded from supply) into
the holes;
• fix the machine to the ground with 4 M8x80 mm
screws (excluded from supply) (
Fig. 5 ref. 1
) (or
with 4 8x80 mm stud bolts (excluded from supply)).
Tighten the screws with an approximate tightening
torque of 70 Nm.
10.0 ASSEMBLY AND PREPARATION FOR
USE
After having freed the various components from the
packing check that they are complete, and that there
are no anomalies, then comply with the following in-
structions for the assembly of the components making
use of the attached series of illustrations.
10.1 Assembly procedures
Remove the packaging and free the machine from the
wrapping. Lift the machine and position it on the floor.
10.2 Post assembly
In case the post is supplied demounted, proceed fol-
lowing the instructions below.
1. Remove the fixing elements needed to fix the machine
to the pallet.
2. Unpack the vertical post (
Fig. 6 ref. 1
) and put it
vertically onto the base.
3. Put the post (
Fig. 6 ref. 1
) onto the base (
Fig. 6
ref. 2
) and fit the pin (
Fig. 6 ref. 3
) into the spe-
cial hole (
Fig. 6 ref. 4
) and block it through the
washers (
Fig. 6 ref. 5
), the spacers (
Fig. 6 ref. 6
)
and the screws (
Fig. 6 ref. 7
). Fix the post control
cylinder (
Fig. 6 ref. 8
) using the pin (
Fig. 6 ref. 9
)
and the seegers (
Fig. 6 ref. 10
).
1
2
7 6
5
3
9 10
6
7
10
8
4
5
Fig. 6
4. At the end mount the rod covering by means of the
supplied screws and washers.