Space-Ray SRLP25 Скачать руководство пользователя страница 1

Overhead Radiant Tube Heaters

INSTALLATION, SERVICING AND OPERATING

INSTRUCTIONS

Gas Fired Products (UK) Ltd.

Chapel Lane, Claydon, Ipswich

Suffolk IP6 0JL, England

Tel: 01473 830551 Fax: 01473 832055

E-mail:

[email protected]

www.spaceray.co.uk

SRUP25
SRUP30
SRUP35
SRUP40
SRUP45

SRLP25
SRLP30
SRLP35
SRLP40
SRLP45

Содержание SRLP25

Страница 1: ...ND OPERATING INSTRUCTIONS Gas Fired Products UK Ltd Chapel Lane Claydon Ipswich Suffolk IP6 0JL England Tel 01473 830551 Fax 01473 832055 E mail info spaceray co uk www spaceray co uk SRUP25 SRUP30 SR...

Страница 2: ......

Страница 3: ...6 38 5 Commissioning 39 41 5 1 Ignition 39 5 2 Shut Down 39 5 3 Checking Gas Pressure 39 40 5 4 Flame Supervision 41 5 5 Air Proving Switch 41 6 Servicing 41 43 6 1 Fan 41 6 2 Control Box 41 42 6 2 3...

Страница 4: ...Page 2 of 48...

Страница 5: ...ut 29 2 kW Hs 26 3 kW Hi Appliance Type B22 Appliance Category II2H3 Adjusted for 2H G20 20mbar 3 G30 G31 29 37mbar Setting Pressure 12 5mbar None Injector No 19 2 6mm Pre injector None None Electrica...

Страница 6: ...s SRU40 6 97m x 0 715m SRL40 13 00m x 0 34m Weight SRU40 81kg SRL40 79kg Gas Connection R Flue Size 127mm Table 8 MODEL SRU45 SRL45 N SRU45 SRL45 L Heat Input 47 0 Kw Hs 42 3 Kw Hi Appliance Type B22...

Страница 7: ...wing Control Box Assembly Fan Assembly U Bend Hanger Bracket Torctite Coupling Fastenings Pack Radiant Tube 76 2 x 4572 Radiant Tube 76 2 x 2285 Reflector Panel 2540 long Reflector End Panel notched R...

Страница 8: ...Fan Assembly U Bend Hanger Brackets Torctite Coupling Fastenings Pack Radiant Tube 101 6 x 4572 Radiant Tube 101 6 x 1524 Reflector Panel long Reflector Panel short Reflector End Panel notched Reflec...

Страница 9: ...containing the following Control Box Assembly Fan Assembly Hanger Brackets Torctite Coupling Fastenings Pack Radiant Tube 76 2 x 4572 Reflector Panel 1511 short Reflector Panel 3035 long Reflector En...

Страница 10: ...ing Control Box Assembly Fan Assembly Hanger Brackets Torctite Coupling Fastenings Pack Radiant Tube 101 6 x 4572 Radiant Tube 101 6 x 3048 Radiant Tube Assy turbulator Reflector Panel 3035 long Refle...

Страница 11: ...access to the appliance for servicing etc 3 1 2 For suspending the appliance it is recommended that suitable protected welded chain 3mm x 65 links per m or 8mm min mild steel drop rods and suitable br...

Страница 12: ...d above measured at the appliance inlet pressure test point A union service cock MUST be fitted as close as practicable upstream of the heater to enable the gas train to be removed for maintenance or...

Страница 13: ...supply must facilitate complete isolation and should preferably be via a fused double pole isolator having a constant separation of at least 3mm in all poles and supplying the appliance ONLY Alternati...

Страница 14: ...cts of combustion air mixture b mechanical evacuation of the products of combustion air mixture c natural air change 3 4 1 1 Ventilation by Thermal Evacuation Ventilation by thermal evacuation is suff...

Страница 15: ...ore no provision for thermal or mechanical ventilation is required in the following particular cases Buildings with natural air change greater than 1 5 volumes per hour Buildings with a density of ope...

Страница 16: ...airflow is proven 3 4 2 3 Outside ducted combustion air supply When installed in a dusty or polluted atmosphere the heater should be fitted with a ducted supply of clean fresh air A length of 100mm f...

Страница 17: ...1 5 0 19 5 0 U Type Speed Clip Reflector End Panel Reflector Panel Reflector End Panel U Bend Radiant Tube 3 x 2 285m Hanger Bracket 2 pos Burner Box Fan Assembly Torctite Coupling A S S B S S A Refl...

Страница 18: ...d is positioned as follows Horizontal Mounting fan outlet horizontal and facing away from the adjacent Control Box for flueless applications and either horizontal or vertical facing upwards for flued...

Страница 19: ...lectrical socket provided fastenings pack as follows Brown Red to terminal marked L Blue Black to terminal marked N Green Yellow to terminal marked 7 External fuse rating required 3A See Section 3 3 f...

Страница 20: ...os Radiant Tube 3 x 4 572m 1 50 A Reflector Clamp Torct it e Coupling Burner Box S Sus pension Point B Reflector Loc ation S B 2 25 0 S S B S Fan Assembly Reflector End Panel U Type Speed Clip Reflect...

Страница 21: ...tions and either horizontal or vertical facing upwards for flued applications Angle Mounting fan outlet vertical facing upwards for either flueless or flued applications Tighten the nuts of the Torcti...

Страница 22: ...lectrical socket provided fastening pack as follows Brown Red to terminal marked L Blue Black to terminal marked N Green Yellow to terminal marked 7 External fuse rating required 3A See Section 3 3 fo...

Страница 23: ...pos Radiant Tube 4 x 4 572m Torctite Coupling Burner Box S B S U Bend Reflector End Panel Fan Assembly U Type Speed Clip Reflector End Panel Reflector Panel A Reflector Clamp B Reflector Location S Su...

Страница 24: ...y with the door latch uppermost see Fig 9 Tighten the nuts of the Torctite Coupling to secure the Control Box to the Radiant Tube taking care to support the Control Box in line with the axis of the tu...

Страница 25: ...ce is balanced on the forks prior to lifting 4 3 8 If combustion air is to be ducted to the appliance attach a length of flexible ducting to the Air Inlet Adaptor of the Control Box by use of a suitab...

Страница 26: ...diant Tube 4 x 4 572m Radiant Tube 4 x 1 524m Hanger Bracket 4 pos B Reflector Loc ation A Reflector Clamp S Sus pens ion Point Reflector End Panel U Type Speed Clip Torctite Coupling Burner Box Fan A...

Страница 27: ...f the U bend as shown in Fig 19 Rivet the U Bend to the Radiant Tube assemblies using the two 5 x 10 rivets provided fastenings pack Fig 19 4 4 3 Assemble the four Hanger Brackets to the Radiant Tubes...

Страница 28: ...wn in Fig 18 Repeat the procedure to attach the Reflector End Panel plain to the opposite end of the Reflector 4 4 8 The appliance should now be raised and suspended from previously fixed chains or dr...

Страница 29: ...7 2 1 34 2 1 5 0 Fan Assembly U Type Speed Clip Reflector End Panel Reflector End Panel Reflector Panel Short Reflector Panel Long 5 0 S Suspension Point B Reflector Location A Reflector Clamp Hanger...

Страница 30: ...Tighten the nuts of the Torctite Coupling to secure the Fan Assembly to the Radiant Tube taking care to support the Fan Assembly in line with the axis of the tube NOTE Tighten the Torctite Coupling s...

Страница 31: ...arance from combustibles see section 3 1 4 when routing the cable from Fan to Control Box 4 5 11 Using twin core and earth flexible supply cable as specified in Section 3 3 2 suitable for 230V 50Hz 12...

Страница 32: ...Clip 8 0 8 0 Radiant Tube 3 x 4 572m S Suspension Point A R eflector C lamp B Reflector Location Hanger Bracket 4 pos Reflector Panel Long Burner Box Torctite Coupling B S 1 5 0 4 2 7 2 29 3 0 S Refle...

Страница 33: ...e NOTE Tighten the Torctite Coupling screws alternately whilst continually checking for slackness of the joint 4 6 5 The two sections of the appliance should now be raised and suspended from previousl...

Страница 34: ...k to terminal marked N Green Yellow to terminal marked 7 Connect this 3 pin plug to the electrical socket marked mounted in the side of the Control Box Due consideration should be given to the require...

Страница 35: ...et 4 pos Reflector Panel Long S Su spe nsion Po int A Refle cto r Clamp B Reflector Location Radiant Tube 4 x 4 572m Torctite Coupling Burner Box 15 0 4 27 2 2 93 0 B S S U Type Speed Clip Reflector E...

Страница 36: ...are to support the Control Box in line with the axis of the tube NOTE Tighten the Torctite Coupling screws alternately whilst continually checking for slackness of the joint 4 7 4 Place a second Torct...

Страница 37: ...Reflector 4 7 9 If combustion air is to be ducted to the appliance attach a length of flexible ducting to the Air Inlet Adaptor of the Control Box by use of a suitable hoseclip Attach the inlet end of...

Страница 38: ...4 572m Radiant Tube 4 x 3 048m A Reflector Clamp Radiant Tube 4 x 4 572m c w Turbulator 3 0 86 B Reflector Location S Suspension Point 2 9 60 8 9 3 2 A 58 4 7 S S B 2 9 6 0 S S S 1 5 0 B S Torctite C...

Страница 39: ...ontrol box in line with axis of the tube NOTE Tighten the Torctite Coupling screws alternately whilst continually checking for slackness of the joint 4 8 4 Place a second Torctite Coupling over the en...

Страница 40: ...each other using two U type speed clips fastenings pack as shown in Fig 24 Screw the remaining 6 retainers to each of the other Hanger Brackets to provide location for the Reflector Panels Note the R...

Страница 41: ...iance for a period of 10 seconds to reset the ignition control If a first reset is not successful wait at least 15 seconds before repeating the procedure After reset an extended waiting time will occu...

Страница 42: ...anometer reading is as stated below for the gas type the appliance is adjusted for see the Data Label affixed to the control box door Category 2H gas type G20 natural setting pressure 12 5mbar 5 3 5 3...

Страница 43: ...rable IMPORTANT 1 Do not rest anything especially ladders against the appliance 2 Gas and Electricity supplies must be isolated before commencing servicing work or replacement of components 3 Unless i...

Страница 44: ...cessary with a soft bristle brush DO NOT DAMAGE THE INJECTOR ORIFICE BY USE OF SOLID OBJECTS 6 2 4 3 To remove or replace the Injector unscrew it from the Injector Fitting using a spanner whilst retai...

Страница 45: ...t gas and electricity supplies to the appliance before carrying out any repair work This work can be carried out at high level using a purposes designed access tower but it is preferable that this wor...

Страница 46: ...the Air Proving Switch to the floor of the Control box and lift out with the electrical leads attached 7 4 3 Disconnect the three electrical leads from the Air Proving Switch by gently pulling the con...

Страница 47: ...press the spring fixing washer over the body of the Neon Indicator and up against the Control Box floor panel to secure the Neon Indicator Connect the electrical leads in accordance with the wiring d...

Страница 48: ...e door open 9 2 Turn on the gas supply to the appliance 9 3 Set any time switches or thermostats to demand heat 9 4 Switch on the electricity supply to the appliance The red neon indicator and amber n...

Страница 49: ...Page 47 of 48 NOTES...

Страница 50: ...Page 48 of 48 07 05 GB IE ES IT PT 483S...

Отзывы: