During field assembly of the heater, the recommended procedure is as follows:
a)
Before hanging heater sections, first determine the actual layout of the system. See section 8.0 for
complete heater dimensions. Consideration must also be taken for flue pipe, fresh air ducting, gas piping,
clearances to combustibles, etc. before hanging heater. Typical suspension methods are shown in Section
9.0.
7.2)
TYPICAL ASSEMBLY LAYOUT
–
(WITH TURBULATORS)
Содержание PGR 100-L5
Страница 47: ...Form 43343120 46 July 2021 18 0 CONTROL COMPONENT LOCATION ...
Страница 49: ...Form 43343120 48 July 2021 20 0 TROUBLESHOOTING GUIDE SINGLE STAGE N5 L5 ...
Страница 50: ...Form 43343120 July 2021 49 TROUBLESHOOTING GUIDE SINGLE STAGE CONTINUED ...
Страница 51: ...Form 43343120 50 July 2021 TROUBLESHOOTING GUIDE SINGLE STAGE CONTINUED ...
Страница 52: ...Form 43343120 July 2021 51 20 8 TROUBLESHOOTING GUIDE TWO STAGE N7 L7 ...
Страница 53: ...Form 43343120 52 July 2021 TROUBLESHOOTING GUIDE TWO STAGE CONTINUED ...
Страница 54: ...Form 43343120 July 2021 53 TROUBLESHOOTING GUIDE TWO STAGE CONTINUED ...
Страница 56: ...Form 43343120 July 2021 55 21 10 REMOVING GAS VALVE AND MANIFOLD ASSEMBLY 21 11 AIR SWITCH PRESSURE CHECK ...