![SP Scientific LYOSTAR II Скачать руководство пользователя страница 57](http://html1.mh-extra.com/html/sp-scientific/lyostar-ii/lyostar-ii_operators-manual_1338679057.webp)
FTS Systems LyoStar™ II
Optional Cleanroom Configuration
Rev 012, 04/11
49
© SP Scientific 2011
Placement and Initial Set-Up
Roll the unit into position using the casters. Ensure that the surfaces of the interface
plate and wall flange are positioned properly relative to the rough opening in the wall.
Once the unit is properly located, the leveling feet can be lowered to stabilize and
level the unit. Typically, the shelves in the product chamber are used as the reference
for adjusting the leveling feet. Please note that the leveling feet are intended to just lift
the unit off a level, uniform floor. Under some conditions, it may be necessary to add
an additional shim under the leveling feet.
In most cases, the wall flange can be sealed and secured to the wall using clear RTV
and #10 x 1 ½” long, stainless steel, pan head wood screws.
Содержание LYOSTAR II
Страница 1: ...LYOPHILIZER OPERATOR S MANUAL FTS SYSTEMS LYOSTAR II STANDARD...
Страница 2: ......
Страница 6: ...iv Rev 012 04 11 SP Scientific 2011...
Страница 29: ...FTS Systems LyoStar II Operating Your Lyophilizer Rev 012 04 11 21 SP Scientific 2011...
Страница 38: ...Data Management FTS Systems LyoStar II 30 Rev 012 04 11 SP Scientific 2011...
Страница 52: ...Optional Isolation Valve FTS Systems LyoStar II 44 Rev 012 04 11 SP Scientific 2011...
Страница 58: ...Optional Cleanroom Configuration FTS Systems LyoStar II 50 Rev 012 04 11 SP Scientific 2011...
Страница 66: ...General Maintenance FTS Systems LyoStar II 58 Rev 012 04 11 SP Scientific 2011...
Страница 70: ...Appendix A Troubleshooting FTS Systems LyoStar II 62 Rev 012 04 11 SP Scientific 2011...
Страница 71: ......