
44
Operating instructions UVR-300/UVR-400 | Heinz Soyer Bolzenschweißtechnik
7.7
Differing work steps for UVR-400
The following describes different work steps/tasks for the UVR-400 universal feeder.
These tasks are only required for the following stud dimensions: M10, M12 and Ø 10.8.
Turn off the mains switch on the device, disconnect the main air supply and
remove the cover hood.
No limit stop distance plate (a) is required for the stud dimensions M10, M12 and
Ø 10.8. Remove the limit stop distance plate (a) and the tommy screw (b).
Replacing the connection piece for the stud feed hose and rotating the stud retainer
(UVR-400 universal feeder)
Step 1:
Turn off the mains switch on the device, disconnect the main air
supply and remove the cover hood.
Step 2:
Loosen the fastening screws (a) and remove the cover panel (b).