OFF-GRID RACK INSTALL INSTRUCTIONS

Your rack will arrive in 2 individually wrapped packages. Carefully remove protective wrapping. 

This is a  2 person installation.

EACH UPRIGHT MUST BE BOLTED TO THE WALL. EACH UPRIGHT MUST BE BOLTED TO THE GROUND. ALL NECESSARY 

HARDWARE IS NOT INCLUDED.

HARDWARE / MATERIALS REQUIRED (NOT INCLUDED)

• 

(12) 3/8” Lag Screws with Washers

• 

(3) 2x6” (or larger) Wood Support Boards

• 

General Wood Screws

• 

(2) 1/2” Concrete Anchor

TOOLS REQUIRED (NOT INCLUDED)

• 

Tape Measure

• 

Level (Magnetic Recommended)

• 

Stud Finder

• 

Electric Drill or Driver

• 

Socket Wrench

• 

9/16” Socket

• 

Marker / Pen / Pencil

STEP 1:  

Install (3) 2x6” (or larger) wood support boards 

across your wall perpendicular to the ground using 

general wood screws at these specific heights:

• 

11.5” on center (Bottom Support Board)

• 

49.5” on center (Middle Support Board)

• 

87.5” on center (Top Support Board)

STEP 2:  

While person 2 holds one Off Grid Rack upright, 

vertically level, and flush against wood support boards/

ground, mark pilot holes on your wood support boards 

using a marker/pen/pencil.