OFF-GRID RACK INSTALL INSTRUCTIONS
Your rack will arrive in 2 individually wrapped packages. Carefully remove protective wrapping.
This is a 2 person installation.
EACH UPRIGHT MUST BE BOLTED TO THE WALL. EACH UPRIGHT MUST BE BOLTED TO THE GROUND. ALL NECESSARY
HARDWARE IS NOT INCLUDED.
HARDWARE / MATERIALS REQUIRED (NOT INCLUDED)
•
(12) 3/8” Lag Screws with Washers
•
(3) 2x6” (or larger) Wood Support Boards
•
General Wood Screws
•
(2) 1/2” Concrete Anchor
TOOLS REQUIRED (NOT INCLUDED)
•
Tape Measure
•
Level (Magnetic Recommended)
•
Stud Finder
•
Electric Drill or Driver
•
Socket Wrench
•
9/16” Socket
•
Marker / Pen / Pencil
STEP 1:
Install (3) 2x6” (or larger) wood support boards
across your wall perpendicular to the ground using
general wood screws at these specific heights:
•
11.5” on center (Bottom Support Board)
•
49.5” on center (Middle Support Board)
•
87.5” on center (Top Support Board)
STEP 2:
While person 2 holds one Off Grid Rack upright,
vertically level, and flush against wood support boards/
ground, mark pilot holes on your wood support boards
using a marker/pen/pencil.