– 11 –
LEVER (LDG-A)/(LDG-B)
GEAR (LDG-FT)
shaft
A
shaft
B
shaft
C
1
Fit the lever (LDG-A) on
shafts
A
–
C
and install it.
shaft
A
shaft
B
2
Fit the lever (LDG-B) on
shafts
A
and
B
and
install it.
3
type-E stop ring 2.0
gear (LDG-D)
5
gear (LDG-FT)
6
polyethylene washer
2
tension spring (LD-2)
2
tension spring (LD-1)
gear (LDG-FB)
lever (LDG-A)
hole
hole
4
Align hole in the gear (LDG-D)
with hole the lever (LDG-A).
3
Move the lever (LDG-B)
in the arrow direction.
1
Содержание XR-C7220
Страница 3: ... 3 SECTION 1 GENERAL This section is extracted from instruction manual ...
Страница 4: ... 4 ...
Страница 5: ... 5 ...
Страница 6: ... 6 ...
Страница 7: ... 7 ...
Страница 21: ...XR C7220 C7300 C7300W 23 24 6 4 SCHEMATIC DIAGRAM MAIN Section 3 3 Page 20 Page 22 Page 31 ...
Страница 25: ...XR C7220 C7300 C7300W 31 32 6 8 SCHEMATIC DIAGRAM PANEL Section See page 18 for Waveform Page 24 ...