2-19(E)
SX-M700
2-10. SAFETY CHECK-OUT
After correcting the original service problem, perform the
following safety checks before releasing the set to the
customer.
Check that the set does not have leakage current in excess
of 0.5 mA when measured as described below.
All exposed conductive surfaces are to be tested for
leakage currents. The leakage currents from these surfaces
are to be measured to the grounded supply conductor
individually as well as collectively where simultaneously
accessible, and from one surface to another where
simultaneously accessible. These measurements do not
apply to terminals operating at voltages that are less than
30 volts.
The measurement circuit for the leakage current test is as
described below. The measurement instruments defined in
the following (a)-(d).
a) The meter is to have an input impedance of 1500 ohms
resistive shunted by a capacitance of 0.15 microfarad.
b) The meter is indicate 1.11 times the average of the full
wave rectified composite waveform of voltage across
the resistor or current through the resistor.
c) Over a frequency range of 0-100 kilohertz the
measurement circuitry is to have a frequency response
(ratio of indicated to actual value of current) that is
equal to the ratio of the impedance of a 1500 ohm
resistor shunted by a 0.15 microfarad capacitor to 1500
ohms. At an indication of 0.5 milliampere, the
measurement is to have an error of not more than 5
percent at 60 Hz.
d) Unless the meter is being used to measure current from
one part of the equipment to another, the meter is to be
connected between the accessible parts and the
grounded supply conductor.
The test sequence is as follows:
a) With switch S1 open, the equipment is to be connected
to measuring circuit. Leakage current is to be
measured using both positions of switch S2, and with
the equipment switching devices in all of their intended
operating positions.
b) Switch S1 is then to be closed, energizing the
equipment, and within 5 seconds the leakage current is
to be measured using both positions of switch S2, and
with the equipment switching devices in all their
intended operating position.
c) Leakage current is to be monitored until thermal
stabilization. Both positions of S2 are to be used in
determining this measurement.
Leakage current measurement circuits
Equipment intended for connection to a 120 volt power supply.
Equipment intended for connection to a 3-wire, grounded neutral
power supply, as illustrated above.
Equipment intended for connection to a 3-wire, grounded neutral
power supply, as illustrated above.
A. Probe with shielded lead.
B. Separated and used as clip when measuring currents from
one part of equipment to another.
Содержание SX-M100
Страница 75: ...SX M700 6 12 TMP68301AFR 16 TOSHIBA http getMANUAL com ...
Страница 110: ...8 1 8 1 SX M700 SX M700 M100 BLOCK SX M700 M100 BLOCK SX M700 M100 DIGITAL SECTION 8 BLOCK DIAGRAMS DIGITAL BLOCK ...
Страница 111: ...8 2 8 2 SX M700 SX M700 AUDIO SX M700 BLOCK SX M700 BLOCK AUDIO BLOCK ...
Страница 112: ...8 3 8 3 SX M700 SX M100 BLOCK SX M100 BLOCK SX M100 AUDIO AUDIO BLOCK ...
Страница 113: ...8 4 8 4 SX M700 SX E120 DIGITAL SX E120 BLOCK SX E120 BLOCK DIGITAL BLOCK ...
Страница 114: ...8 5 8 5 SX M700 SX E120 BLOCK SX E120 BLOCK SX E120 AUDIO AUDIO BLOCK ...
Страница 115: ...8 6 8 6 SX M700 SX T100 AU 202 SX T100 BLOCK SX T100 BLOCK AU 202 BLOCK http getMANUAL com ...
Страница 116: ...8 7 8 7 SX M700 SXA 120 BLOCK SXA 120 BLOCK SXA 120 AUDIO CPU 188 BLOCK ...
Страница 120: ......
Страница 126: ......
Страница 128: ......
Страница 130: ......
Страница 132: ......
Страница 136: ......