background image

Energy Storage System “IJ1001SNBT”

38

Open the energy storage server using screw driver and install the lithium ion battery module

Fixing the top cover.

Copyright Sony Energy Devices Corporation

Insert the antenna cable

Top cover

Содержание IJ1001SNBT

Страница 1: ...ge System IJ1001SNBT 38 Open the energy storage server using screw driver and install the lithium ion battery module Fixing the top cover Copyright Sony Energy Devices Corporation Insert the antenna cable Top cover ...

Страница 2: ...orage System IJ1001SNBT 39 Open the energy storage server using screw driver and install the lithium ion battery module Fixing the top cover Copyright Sony Energy Devices Corporation Screw Screw M4 10 Black 4pcs Rear ...

Страница 3: ...y Storage System IJ1001SNBT 40 Set the outer enclosure to the wall Make a hole for conduit inside the bellow area Copyright Sony Energy Devices Corporation 177 8 7in 25 4 1in 25 4 1in 304 8 12in Hole 1 06in ...

Страница 4: ...ure to the wall Fixing the outer enclosure to the wall 4 bolts Copyright Sony Energy Devices Corporation Ground Keep the distance 30cm or more From the ground Bolt For Wood Wall Diameter 3 8 inch Length 3 1 4 inch For Concrete Diameter 3 8 inch Length 3 inch ...

Страница 5: ...Energy Storage System IJ1001SNBT 42 Install the energy storage box into the outer enclosure Install the energy storage server to the outer enclosure Copyright Sony Energy Devices Corporation Install ...

Страница 6: ...Energy Storage System IJ1001SNBT 43 Install the energy storage box into the outer enclosure Wiring 8 position bellow Copyright Sony Energy Devices Corporation Completed photo ...

Страница 7: ...T 44 Install the energy storage box into the outer enclosure Wiring ground terminal using the grounding cable from outer enclosure to the energy storage server Copyright Sony Energy Devices Corporation Ground terminal Completed photo ...

Страница 8: ...ergy Storage System IJ1001SNBT 45 Install the energy storage box into the outer enclosure Check the circuit protector Copyright Sony Energy Devices Corporation Confirm the circuit protector is off OFF OFF ...

Страница 9: ...Energy Storage System IJ1001SNBT 46 Install the energy storage box into the outer enclosure Insert the fuse bar Copyright Sony Energy Devices Corporation Fuse bar Screw Screw M3 8 Black 2pcs ...

Страница 10: ...Energy Storage System IJ1001SNBT 47 Install the energy storage box into the outer enclosure Insert the front panel of the server Copyright Sony Energy Devices Corporation Front panel ...

Страница 11: ...Energy Storage System IJ1001SNBT 48 Install the energy storage box into the outer enclosure Fixing the jig 3 Copyright Sony Energy Devices Corporation Jig 3 Screw Screw M5 10 2pcs ...

Страница 12: ...Storage System IJ1001SNBT 49 Install the energy storage box into the outer enclosure Fixing the jig 4 5 Copyright Sony Energy Devices Corporation Jig 4 Jig 5 Screw Screw M5 10 4pcs Jig 5 Jig 4 Completed photo ...

Страница 13: ... antenna to the outer enclosure Wear metal parts and fix the metal pipe Copyright Sony Energy Devices Corporation Antenna Insert the pipe then lock the connector Antenna BOX Screw out Wear metal parts CK 34Z U 0418 S1 Metal connector Metal Pipe Insert antenna cable ...

Страница 14: ...antenna to the outer enclosure Fix the pipe to the outer enclosure Copyright Sony Energy Devices Corporation Connector and Pipe Connect screw Outer Enclosure Straight Liquid tight Connector 3 4 Trade Size Liquid tight Flexible Steel Conduit 3 4 Trade Size ...

Страница 15: ...to the outer enclosure Connect to the antenna cable and fix the cable inside the outer enclosure Copyright Sony Energy Devices Corporation Fixed using tie Completed Cable from the energy storage server Cable from the antenna Insert the pipe then lock the connector ...

Страница 16: ...uit inside the distribution panel required UL489 Listed rated 240Vac 30A Time delay 3 Cables are used LI Red and N White connected to 120V 60Hz L2 Black and N connected to 120V 60Hz Before start the installation please refer to the next page Copyright Sony Energy Devices Corporation Branch circuit UL489 Listed 240V 30A Time delay Connecting Box UL Listed 30A L1 N L2 GND AC120V 60Hz AC120V 60Hz ...

Страница 17: ...duit hubs use only UL Listed rain tight for entry into the enclosure AC output neutral is not bonded to ground The AC input and AC output circuits are isolated from the enclosure and that system grounding if required by Section 250 of the National Electrical Code ANSI NFPA 70 is the responsibility of the installer The National Electrical Code ANSI NFPA 70 wiring methods are to be used use if neede...

Страница 18: ...um ambient temperature of 60 degrees C CAUTION To reduce the risk of fire connect only to a circuit provided with 30 amperes maximum branch circuit over current protection in accordance with the National Electrical Code ANSI NFPA 70 Units with an integral ground fault detector interrupter JWC1 CAUTION Risk of electric shock Normally grounded conductors may be ungrounded and energized when a ground...

Страница 19: ...Energy Storage System IJ1001SNBT 56 Set the connecting box and conduit Conduit work Copyright Sony Energy Devices Corporation Wire from distribution panel ...

Отзывы: