HCD-IS10
20
3-19. LEVER (LOADING-L/R)
2
two hooks
4
two hooks
BOTTOM VIEW
3
lever (loading-L)
5
lever (loading-R)
SPT-T (loading-R)
SPR-T (loading-L)
1
1
PRECAUTION DURING LEVER (LOADING R / L) INSTALLATION
lever (loading-R)
Align the horizontal position.
lever (loading-L)
Install the
both levers so that they move symmetrically.
www. xiaoyu163. com
QQ 376315150
9
9
2
8
9
4
2
9
8
TEL 13942296513
9
9
2
8
9
4
2
9
8
0
5
1
5
1
3
6
7
3
Q
Q
TEL 13942296513 QQ 376315150 892498299
TEL 13942296513 QQ 376315150 892498299